All projects contain risk. Getting out of bed and taking a shower involves risk, you can slip and fall. The larger the project, the larger the sample size and the more statistical considerations for risk should be managed.
Modern western society has greatly lost all tolerance of risk. One difference that struck me for risk culture, compared to the past, is old footage of the 1955 Le Mans disaster: after the catastrophic crash, bystanders themselves helped carry bodies away from the scene, and clean up wreckage. This calmness and social damage tolerance in the process of a disaster is very different from a modern "evacuate and let the professionals handle it" attitude, and I think this is an example of a clear shift in social tolerance of risk.
I wonder if the Apollo project would have worked today, instead of in the 1960s. At the scale of an infrastructure project of half a billion dollars, we're not talking about something so big that zero injuries safety standards are bad. However, as you get larger projects, it is statistically impossible to keep risk at 0; I'm not sure how willing modern society is to accept that injuries on large projects is inevitable.
Elsewhere in this thread, user JumpCrisscross comments about comparing the cost overrun to the second bid. Following up that comment, the top response is something along the lines of "nobody was injured, so showering the contractor with money is ok". This attitude is prevalent in modern society, and it doesn't really get questioned. Let's pose a hypothetical scenario: If a person has their leg broken, let's say a platform caused someone to fall and hurt their back. Would that amount of damage be worth a $250million additional cost? Think of the amount of social good you can do with $250million. At what level does society overvalue the reduction of risk? This is an important question to ask.
Let's not even talk about minor injuries. Let's say 1 person died. If you walk up to a random person, tell them that they have the opportunity to die; BUT their immediate family would receive $125 million dollars, and $125million would be donated to the charity of their choice. I suspect a very large percentage of people would actually be willing to take that offer.
And yet, giving an extra $250million to a contractor to build something is considered "worth it" to the general public if no injuries were reported. At which point does society overvalue reducing risk?
In fact, people would even volunteer to die for "just" $100million. Just see this reddit thread: https://www.reddit.com/r/AskReddit/comments/4jqfka/what_woul...
This is EXACTLY what I mean by "risk management for large projects". For a small $10k project? A small percentage cost decrease for increased risk of death isn't worth it. For a multi-billion dollar project? All of the sudden, the incentives change drastically. How many people would be willing to work on a project that is a tiny amount more risky, but knowing that their families will be handsomely compensated in case anything happens? If you told me that my family will receive $100mil guaranteed if I die/get maimed, there's very little I'm not willing to do.
Also, to note: $100,000,000 is enough to save around 30,000 children from an excruciating death by malaria.
TL;DR 1 average human life generally isn't worth throwing away $250million. I will literally volunteer my own life on this fact.
Who cares if Oroville Dam is in the USA or not. The same thing would still apply if it was in the UK. I'm merely saying the modern public should reconsider spending $250million extra, instead of applauding it simply because no injuries happened.
Fuck those construction workers, fuck those miners and who cares about factory workers. After all they're disposable. /s
Workplace safety is there for a reason: to stop white collar criminals from putting a price on human lives and then to optimize for the lowest they can get away with.
Suppose you wanted to reduce risks for computer programmers - everyone gets a personal doctor who sits with them to monitor their vitals, state of the art monitoring device, daily blood tests, screenings for all sorts of diseases. Each person gets a fitness coach, dietician, sleep coach, whatever. Programmers with injuries get oxygen therapy and physios on hand. Basically you treat them like world class racehorses (!). Whatever, hopefully you see the point.
Would that be overkill? No? Well then you don't think programmers matter at all and want to see them all die in industrial accidents. /s
If we can accept at any point that we should, maybe not buy the most expensive chair/table/keyboard/screens, even if there's a chance of injury (eyesight, cardio problems from 20 years of sitting, cut from a sharp edge on a filling cabinet, etc.) then you're agreeing with the general concept of the OP IMO.
Now, in public procurement, should we pay $1000 per seat for a currently $100 app to ensure no programmer ever gets a thrombosis/carpal problem/etc.?
I would highly doubt that $250mil went into slower progress for the sake of safety. Definitely, there were other costs.
You're supposed to only consider the abstract idea I presented. That's why I changed from $250mil numbers to $100mil halfway through, although I didn't make it fully clear to divorce the concrete numbers from the abstract cultural ideas.
That idea was made up in this thread, it doesn't reflect reality.
The cost overrun was explained in the article as due to only scoping out 30% of the project as part of making the bid, and as such underestimating how much concrete they would need:
> Jeff Petersen, project manager for Kiewit, said that once construction workers got on the site they discovered they had to dig much deeper to get down to bedrock than they had expected. That meant they are having to pour almost twice as much concrete this year — 870,000 cubic yards — as the company and the Department of Water Resources had planned.
I was objecting to the idea that having nobody dying on a project being a bad thing because it implies overspending on safety.
Construction is dangerous, if you are willing to compromise on that then you'll see that you can do even better when you drop that price. And before you know it we're back in the 1930's again.
I'll but the question back to you: how much are you willing to pay to save one additional life? $1 million? $1 billion? $1 trillion? $100 trillion? (That last is more than total gross world production.)
I've got my own considerable problems with numerous elements of evaluating costs and benefits in economics, many of which I've been trying to articulate for over three decades and am only just now starting to get a handle on. I would not argue, for example, that just straight earning potential is an adequate basis. I also don't think that various proposed "market bid" rates for how much individuals are willing to accept under very specific and limited conditions are particularly useful.
But even accounting for community, social, and disruption losses, somewhere between tens and hundreds of millions is likely a reasonable balance.
Part of society involves distributing decisionmaking and risks. And no, not always equally. I don't find the argument that those most adept at accurately and fairly assessing risks are necessarily those who can accomplish the tasks involved.
To put this in a different field: I'd not expect my airline pilot to be the best qualified accident investigator, nor systems engineer, nor aircraft fabricator. And I as passenger bear the consequence of their combined work.
Reality bekons, if you care to heed its call.
The understanding is that 1. society should be allowed to consider increased risk, and 2. in the event something bad happens, the victims should be compensated.
In fact, one of my examples of risk was the Apollo project, where the most notable 3 casualties (Apollo 1's Virgil Grissom, Edward White II, and Roger Chaffee) were highly paid astronauts with engineering backgrounds. I'm not discriminating against construction workers, I'm making a statement on acceptable risk in society in general.
Finding a balance on putting price on human life is simply a necessity. I have a friend who's a petrol engineer working dangerous jobs at a high salary, and it's a risk he's willing to take. However, the modern general public is culturally shifting to people like you who literally hear the words "possible risk" and the frontal cortex of the brain shuts down and start ignoring the costs.
George Mueller (who was head of NASA during the Apollo program) said that it would be impossible to repeat Apollo today without it being a classified program as Congress has passed so many laws and regulations in the meantime.
Source: https://dominiccummings.com/2017/06/12/the-unrecognised-simp...
What I can't say is whether this is a good thing or a bad thing. There's a part of me that recoils at the thought of putting a price on a life. Then there's another part of me that recoils at the selfishness of bankrupting my wife should I get cancer. That same selfishness recoils at the thought of bankrupting myself should she get cancer.
I'm not looking forward to those decisions.
Historically, the people investing in safety were not the people who were exposed to the risk. That created perverse incentives, where $1 in safety improvements that would save an average of $10 in human health or life would be rejected because the people who would pay the $1 would not be the ones paying the $10.
That’s still true, of course, but we at least attempt to make people do the right thing.
Regulators today aren’t afraid to assign a dollar value to a human life and reject safety improvements that don’t have a positive ROI. The standard value currently is something like $8 million.
I suspect that the parent wasn’t downvoted for callously making a good point. They were downvoted for baselessly assuming that the correct level of safety tolerance would result in injuries or deaths on this project, and doing so callously.
Having worked a little bit of industrial construction in a past life, it's amazing anything gets done at all, if you do follow all the rules. And even then all it takes is one slipup to get somebody hurt.
https://en.wikipedia.org/wiki/Value_of_life
Serious injuries are some fraction of that, e.g., ~$1M for a limb. The correct tradeoff between safety and cost obviously depends on the marginal cost to increase safety, which is known to the project leaders but not us, but I'd be surprised if the optimal number wasn't between 5% and 25% of total cost. 5% of $500M is $25M, so for a project of this size I'd expect, as a lower bound, at least one death and a dozen serious injuries.
To be clear: by not making this trade off and by spending huge amounts of money to ensure such tiny injury rates, we are wasting resources that could be spent on saving lives at the rate of $10M/life. Indeed, this number is the key threshold by which the EPA decides which environmental interventions to fund, or the NHTSA decides which traffic safety measure to take.