Let's say it realistically costs $150 million a mile for the project (about average for tunnel boring - it'll actually be a lot more on the east coast due to it being solid rock and expensive labor, but let's be realistically optimistic). At 250 miles, that's $37.5 Billion right there. Let's be ridiculously generous and finance this over 50 years. Over 50 years, that's $750 million/year. Or, $2million/day. At $60/ticket, you need 34k daily riders.
And that's only for building the tunnel. I haven't even factored in operating or finance costs, nevermind the millions of other expenses that this needs. Stations are normally the most expensive part of a system, for example, and a station in NYC might cost $1 billion by itself.
Is this going to get 34,000 daily riders paying $60/ticket to NYC? I can see that happening with $10/ticket, but not at $60/ticket. For comparison, the entire DC Metro system itself has about 800k daily riders with about $5/trip.
And then you have the stupid HyperLoop concept itself, which hasn't even been invented yet. It's based on small single-car vehicles, which may carry a couple dozen people at most. Already you can see capacity issues: To get 34,000 people a day 24-7, you need 1400 fully-packed rides a day, or one every 6 seconds. You're not going to get single-vehicles to share a track every six seconds. You're already capacity limited. How do you even slow down? Ingress/egress?
And the concept itself is horrific: https://www.youtube.com/watch?v=RNFesa01llk
Like WTF people? How are there adults that believe any of this garbage?
If you know anyone in your company that believes in this, just fire them on the spot. Make examples out of them. There's no excuse for this.
Stick with what works: high-speed rail, which can transport a thousand people or more in one trip and doesn't need some dumb vacuum tube. This is the real competition for this.
Larry Hogan has failed Maryland.
And Elon Musk is the worst thing to happen to tech.