The $1.6 billion Central Subway should have been funneled into DTX. But of course Rose Pak delivered the votes, so thats why that's getting built and DTX is not.
The $1.6 billion Central Subway should have been funneled into DTX. But of course Rose Pak delivered the votes, so thats why that's getting built and DTX is not.
The mere idea of having a transbay bus station is flawed. Passengers should transfer from there busses to BART and cross the bay on BART. And if you say “well BART is crowded and has problems”. Yes it is and those should be fixed and a second teansbay tube should’ve been built instead of a $3billion (?) bus station.
I know you're counterpointing here, but really it nets out the same. Connecting transport increases it's potential.
It baffles me that SF chooses not to integrate Bus, BART and Caltrain.
SF does not choose that. In fact SF has long chosen to integrate bus, Muni rail, and BART, and more recently also Caltrain, though getting the Caltrain part done has been hampered by a number of problems, including the cost overruns of Transbay Transit Center’s first phase, which have eaten up the money for the second phase.
Edit: by "don't coordinate," I mean there are no timed transfers between systems.
Yep, the Central Subway was a deal. Pak was able to turn out votes to defeat the progressive candidate, Matt Gonzalez, in 2003 and Pelosi delivered the Central Subway.
https://en.wikipedia.org/wiki/San_Francisco_mayoral_election...
http://www.sfgate.com/bayarea/article/Pelosi-secures-federal...
Local politics are local.
Port Authority unveils finalist proposals for Bus Terminal redesign 8 The cost of these proposals range from $3.7 billion to a staggering $15.3 billion https://ny.curbed.com/2016/9/22/13022514/port-authority-bus-...
The Embarcadero Freeway came down with the 1989 freeway. Tearing it down vs rebuilding it was a 6-5 vote for tearing it down. Chinatown deeply resented it not being rebuilt and Agnos lost re-election. That probably led to the Central Subway.