This doesn't sound right at all.
This doesn't sound right at all.
https://www.nytimes.com/2017/05/01/nyregion/new-york-subway-... http://www.nydailynews.com/new-york/nyc-subway-relies-decade...
"Even something as basic as a cable is an antique.
Workers popped open a junction box to show a 70-year-old cloth-covered cable, due for the scrap heap next year, connected to newer rubber-covered wires."
Basically, the system is so old that an incremental retrofit is very complicated to achieve without full shutdown. Remember the overall NYC subway system is the only train system that actually operates 24-7 so maintenance scheduling is also much more involved.
Good one. They routinely shut down lines and stations for hours/days at a time. The L got shut down between Bedford & 8th Ave for the entirety of Memorial Day weekend. Even when lines are running perfectly, at night they only run once every 30-60 minutes. To riders the changes feel arbitrary and are impossible to predict. I've been stuck dozens of times in random places because I tried to use the wrong line at the wrong time. The only real way to know there's a problem ahead is to have the privilege of riding that line on a regular basis and reading the signs they post. If you look around almost every station will have posters denoting some change that's ongoing or coming up.
Also entire train lines frequently run in parallel a few blocks from each other.
And in fact Google Maps does a decent job of scraping it as well. You just need to remember that when Google Maps wants you to go to Jay St. Metrotech instead of High St it might not just be because it thinks it's 300m closer.
It always seemed strange to me that Philly is the only city I've been to that fully replaces the subway at night with buses.
No, it shouldn't, and I take it by this statement you don't live in NYC. I do, and have lived in Tokyo and other cities with excellent mass transit. While Tokyo's system is much, much better, it's pretty fantastic that I know I can always get a train home no matter what time it is, no matter where in the city I am, much faster than any ground vehicle would take me.
This is a decent compromise.
Chicago's subway is 24/7, too.
Hard to prove this is the case, but it smells right to me. Modern signaling system that did nothing but give arrival times to the public would not have to make use of any infrastructure at all -- it could run completely independently -- and could be done for a tiny fraction of the billions of dollars that the MTA is spending on the slow work they say is currently necessary to get it.
Second, MTA estimate about 16 miles of track could be upgraded per year. They have 665 miles of revenue track (850 including non-revenue), so it would take 41.56 years just to convert the revenue track. The Regional Plan Association wants MTA to convert 21 miles of track per year, leading to 31.66 years to cover all the revenue track.
Add the time to create new rolling stock, any additional time for any additional track in the next 30+ years, and extra time in case they go over the original estimation. Easily between 35 and 50 years just to convert the revenue-generating track.
https://en.wikipedia.org/wiki/Signaling_of_the_New_York_City...
Actually, it isn't even all post-2000s trains. The CBTC [2] train controls aren't even on all of the post-2000s trains. In fact besides the 'L' train which has already been converted, only the 7 line has all of its cars as CBTC [1].
This is really bad news, because ideally, the very, very crowded 4,5,6 lines mentioned in the NYT article should be the lines to have the signals computerized, but the 4, 5 trains are relatively "new" having been put in service in 1999-2003 or so. Some of the trains in service are > 50 years old.
[1] https://en.wikipedia.org/wiki/New_York_City_Subway_rolling_s...
[2] https://en.wikipedia.org/wiki/Communications-based_train_con...
2) Downtime basically shuts down the city. Even nights and weekends interruption in service causes major disruptions. The surface streets are at maximum capacity, there is no way to get that many people in and out of downtown and midtown without the subway.
Caltrain is on year 5 of their "3 year" project to modernize their signaling system... and that's a relatively simple 75 mile system with 30 stations and it's almost all above-ground.
Because currently, the residents would riot over the taxes/fees cost of redundancies required to enable faster maintenance and upgrade projects of a 24x7x365 operating system, where the pain of maintenance is constantly deferred until it turns into a looming, critical safety-liability issue. Back when the population density was lower and the pace of life slower, and less economic dependencies upon this infrastructure, the disruptions were affordable and more palatable, but now there are likely powerful stakeholders pressuring the Port Authority from taking as many outages as they'd like these days, comparatively. When I used to live in NYC, the Port Authority took a lot of abuse from a lot of different quarters for every line shutdown for planned maintenance. Increases in fares to fund future expansion/maintenance was met with a lot of resistance. They were like sysadmins for NYC.
Any talk of use pays is met with outrage about how low income people out in the boroughs couldn't afford it, so the whole system continues to operate as a horribly inefficient welfare system for poor people to get to underpaid jobs in the city, instead of a transit system. It would help a lot to double (triple?) the fares overnight, and give the poor people out in the boroughs a free metrocard - at least that way you're capturing the value provided to the rich people and tourists all the way through manhattan and brooklyn.
50 years might be an over estimate, but projects like these tend to slip their deadlines.
[Edit] peterwwillis's answer is much more thorough than mine https://news.ycombinator.com/item?id=14948951
If trains normally average, say, 30mph, and 12 times per hour in one direction, a 0.5mile restriction adds 5 minutes to the journey time. Now we can only run 11 trains per hour -- which messes up the whole schedule.
The periods where there isn't a train passing will be quite small. Is there time to get any necessary equipment onto the track, start the work, then clear the equipment away before the next train is approaching?
What happens if the staff make an error, and break the existing system? It might not be possible for trains to move, in which case we now need to evacuate hundreds of passengers along the tunnel.
Work within metro tunnels while trains are running is, therefore, very unusual.
The solution, of course, is to rewrite the subway in Rust.