New York’s Subways Are Not Just Delayed, Some Trains Don’t Run at All
nytimes.com
nytimes.com
Politicians should be pushing for serious procurement and labor work rule reforms, otherwise the systemic managerial and operational deficiencies will ensure that the deterioration of service we see now will repeat it self in 5 to 10 years, regardless of how much money or technology is poured into the MTA.
London and Toronto have been able to modernize much of their transit systems in last 5 years and its not because they have more money. Once you fix the top everything else will fall into place.
Look what Andy Byford has been able to do in 4 short years at the TTC. His 5-Year Plan to modernize the TTC focused on transforming corporate culture and updating internal processes, in addition to new equipment. The results of these changes have been overwhelmingly positive with the TTC recently being named best public transit agency in North America and The TR Class of TTC subway cars in May having a MDBF of over 924,000 miles.
If your interested in getting involved with transit activism in NYC I highly suggest you follow @2AvSagas on twitter.
http://issendai.livejournal.com/572510.html
The system is too essential for a stop-the-world overhaul, but so far gone, that only a stop-the-world overhaul can part the clouds.
Without a hard flush of antiquated mission critical infrastructure, millions of turbulent eddies and vortices will ensure that the system is always afflicted by parasitic equipment and debris.
Not sure how you do this with subway tracks...
That raises the costs a bit though, if you actually had full service via 3 lines. Public transpo is already insanely expensive per rider over the 10-20 year term.
New York is probably the most easily upgraded of these legacy subway systems, due to the insistence of the original subway companies on triple tracking. Not only does the triple track allow for express trains, but it also allows for zero downtime maintenance during non-peak hours. The electrical systems aren't a barrier like those in some cities. Even Tokyo and London, which have worse constraints, have fared better. If technology transition teams exist, I haven't heard of them. Upgrade engineering appears to be outsourced. The costs that the MTA quotes for transition seem absurd. Once again, I'm no expert on the engineering involved, but the upgrade costs are approaching new construction costs in other countries.
We know we have a major cost problem in US transit infrastructure construction. But this is not just construction. We also have a problem with maintenance costs, operating costs, capital costs, etc. Everywhere you go in America, we have critical transit infrastructure that is hobbled by costs. Where is the cost management? Why can't we get system-wide cost audits? If annual audits are required of publicly listed companies, why isn't it required of public organizations funded by tax dollars?
I'm sick of the explanation that our problem is funding...its not. Our problem is mismanagement. When you manage your systems well, nobody has any problem sending money your way. The demand curve exists for government funding just as much as it does for markets. When you provide more for a given amount of money, you generally get more money. Give us better management.
It's gonna be hard considering how many independent and adversarial managers the NYC subway has.
Accountability and power need to stay in the same hands. Being held accountable for a task you are powerless to affect is a powerful recipe for dysfunction. In context, funding is power - the power to make decisions about who gets how much funding and resources to improve the system. If you have funding, but no accountability, then you will simply redirect that funding to projects which are are actually accountable for.
Electing an MTA head, without giving that head dedicated funding, will be a political nightmare.
(And it is possible to shut down one track of a two-track line for at least part of the way, if you're willing to run only one train through the affected stretch of track at a time. It may condemn you to fifteen or twenty minute waits between trains, but you can do it. The Washington, DC metro has been doing this a lot lately on weekends.)
Hogwash.
The "problem" is that you may have to invest for a long time , continuously before you see the result. This is politically untenable, not engineering untenable.
But the L now is (I believe) only one of 2 lines with modern signaling and CBTC (computer based train control), it was the first to have countdown clocks, and it runs with the least gap time (headway spacing) of any trains in the system.
That being said, it still is extremely overcrowded because of waterfront highrise development and the general shift to Brooklyn. This is why you're starting to see conversations about extending platforms (which for the underground stations is incredibly expensive).
And yes, I'm aware of the Sandy tunnel remediation work shutting it down for a year or so.
Still, the L is already upgraded (so is the 7 which also doesn't share much track). It's getting CBTC on the other lines with modern signaling that will be the hard jobs because of shared track.
And yet the working poor buying single trip tickets, because they can't afford monthly passes, end up paying more per trip than someone who can afford the monthly pass. So the policy doesn't even meet the goal that the policy purports to shoot for.
And still another problem is that the system capacity is insufficient for demand. The design has reached it's scalability limit. We need transporters in NYC, or something, at this point. A continuous running conveyor-belt "people mover" like in airports might be more efficient.
No, the overcrowding is the effect of the MTA not addressing massive increases in ridership over an almost 20 year period. The MTA likes to pretend publicly that the ridership boom came out of nowhere and blindsided everyone. However the increase in ridership has been occurring and been every since 1998.
"Between 1975and 1998, New York City subway ridership hovered between about 900 million and 1 billion riders annually. The net change between the annual ridership in 1975 and 1997 was about 100 million, an average increase of just over 4 million per year. However, 1997 was a turning point for the relatively stagnant ridership growth experienced by New York City’s subway system. In 1998,just after the introduction of the MetroCard, over 137 million more rides were taken than the year before. The boom continued for the next two years, during which time another 181 million rides had been added to the annual total. Over the next 15 years, the system continued to increase its ridership totals at an average of 25 million more rides per year. In 2015, subway rides totaled more than 1.7 billion."[1]
To make the current situation with chronically late trains worse there is no way to know when the next train is coming until you have paid for a fare and are standing down on the platform. Little good it does you then to find out that next train is not for 12 or 15 minutes.
The MTA could have put the electronic arrival boards up on the street level by the train entrance so that people could make an alternate choice such as to use a Citibike, taxi, bus or even just walk instead. The MTA decided to reserve that space to sell advertising however. Despite their press release you will not find the next arrival times on any of these. See:
http://www.mta.info/news/2012/03/29/digital-urban-panels-deb...
[1] https://wagner.nyu.edu/files/faculty/publications/State%20of...
SO MUCH THIS.
Fortunately, because the MTA has exposed the live schedule data, Google Maps lets you check this (sadly, it isn't 100% reliable: oftentimes a train will claim to have arrived somewhere, or even be departing from a station, while it's still getting there).
Yes and the issue is that the MTA doesn't make the service disruption data available.
See: https://medium.com/transit-app/how-were-bringing-real-time-c...
Why wouldn't you make this data available? Why stop short? Most likely because it would expose just how many unplanned maintenance disruptions there actually are.
That is a huge change. Frankly, knowing nothing else I would almost be willing to guess that what accounts for the change is better tracking due to the new MetroCard system.
A more likely explanation is that Metro Cards simply made it a better deal since they now allowed you to transfer between the subway and bus on the same fare and they also offered riders unlimited 7 day and unlimited 30 day options.
See: http://www.mta.info/news-subway-bus-new-york-city-transit-me...
Blocks on a railway system are designed to provide enough space and warning so that trains do not crash into each other. However, when you use line side signals and CTC (Centralized Train Control) to dispatch them, you end up with a set of rules that create spaces for occupancy that can easily be longer than the trains themselves.
In the NYC subway, speaking as an observer as opposed to an insider, the signaling and dispatching requires certain distances between trains and headways (time between trains) to provide safety of 2-4 minutes. However, this results in the cascading delays as one train that dwells too long in a platform can have a stacking effect on trains behind.
For example, if your minimum block distance is 1000 feet, and a max length train is 500 feet, a stack of five trains waiting to enter a station would actually occupy 5,000 feet of track. This could stretch to previous stations along the line.
The best solution would be dynamic blocks and cab signals, where the system itself defines spaces occupied by trains and only allows a train into a space where it can occupy safely, but also can make the distances dynamic based on conditions. Cab signals would be required as you can't have dynamic blocks with line side signals.
However, to do this requires a massive investment in new equipment both line side and on the trains that would take years to implement, along with a massive amount of painful work that would cause even more issues while it is being set up.
Sadly, running more trains probably won't cut it as the system literally cannot handle more safely.
this included the stations: you would have one train coming in the back as the previous train was still going out the front
apparently they special cased the stations to not do this, as this used to cause upset amongst the passengers!
If it becomes normal, it's too easy to make a mistake during the procedure, and cause an accident.
The 456 is a nightmare, and I can tell you first hand, that it is crowded to a point where it is inhumane (imagine people literally fighting for a spot to have the "privilege" to smell the arm-pits in their faces).
The Q line is well worth the headache, and the frustration of dealing with the 456.
Another trick is that if I'm at Union Square trying to get into Brooklyn on the L and the station is packed, it ends up being faster and more comfortable to take the L backwards to 8th ave, and then grab a seat on the Brooklyn bound L at the 8th ave terminus.
In my estimation, shoving onto the train just wasn't worth it. It makes the ride much more miserable for people in the car, and it delays the line even more. The second point is important; the train situation isn't going to get better by people being selfish and gaining a few extra minutes at the expense of everyone else's.
More often than not, the "second train" strategy works wonders. I found that when it doesn't, I'd have to wait for multiple trains anyway. Maybe once in 7 years did I skip a train with room and get punished for it.
In my ~17 years of living in NYC, I've never found it to be worth it trying to squeeze myself onto a train. The ride itself is awful and literally you're at most saving a few minutes at the expense of a terrible, terrible experience in the car. The next train almost always has fewer people on the car, and if that's not the case, the one after that most certainly does.
[Edit: I've also been fortunate enough during my time here that I could always afford to be a few minutes later to my destination, that is not always the case amongst those who take the subway]
Doesn't that pretty much sum up the New York experience though? If everyone could not block the intersection, stand back from the baggage claim, and wait their turn then life would be better for everyone.
At Secaucus Junction (the last stop in NJ before NYC Penn), there will usually be a ton of people waiting for the train. Invariably, they cram onto the first train to come (which is already full) despite the big flashing notices on the timing screen that there's another train to NYC two minutes behind.
I've seen adults throw straight-up temper tantrums at being unable to get onto that train when there's an empty train following right behind.
Now, take adults who pay one of the nations highest property taxes, throw in confusion as to where their dollars are going (they thought infrastructure was definitely a bucket), and you have a perfectly good reason to throw a "temper tantrum."
Most NJ complaints, and attempts to speak with your local politician, or even a local agency, falls on deaf ears. Thus, what can these grown adults do when they are pretty entrenched into Jersey? It's frustrating. I moved out of NJ after spending my HS years, Undergrad years, and 1 year of work, and vowed to never give them another tax dollar because their government is filled with people who simply do not care about your problems.
But I agree with your point.
All of this, by the way, is a topic that's rarely discussed when people are going "build up!" and otherwise densify cities. Without the rest of the infrastructure it's a recipe for complete gridlock.
I only lived about 2 miles from work so as long as there wasn't a foot of snow on the ground, I would just walk. 40 minutes of fresh air beats 20 minutes on a stuffy train every time.
It was definitely a welcome addition though. It probably takes half the time to get to Penn Station from the UES now.
I'm really not sure which is the better case. Trains always arrive in a short time, but can be full. Or you may have to wait longer for a train, and then a little longer still for the train right behind that train that isn't as full.
This kind of problem is not easy to solve- it’s not the kind of thing that has a closed form solution. You typically use a discrete event simulator to model the outcome of different strategies. It seems clear to me, though, that the answer is going to be a mix of “maximize number of trains” and “space them out nicely” during rush hour. I bet the optimal strategy trades off those two variables based on some probability distribution of “expected number of available trains” over time, such that if the number of likely available trains is lower you space them out more, and so on.
In Moscow the metro is running really smoothly since the day of it's creation except for a single day. But that was because of Hitler.
I don't care about the delays or capacity. I just wish NYC subway stations weren't so filthy. Yes, they've gotten better in the past 20 years, but every time I go to oversea, I'm reminded of how disgusting nyc subway is.
This doesn't sound right at all.
The solution, of course, is to rewrite the subway in Rust.
https://www.nytimes.com/2017/05/01/nyregion/new-york-subway-... http://www.nydailynews.com/new-york/nyc-subway-relies-decade...
"Even something as basic as a cable is an antique.
Workers popped open a junction box to show a 70-year-old cloth-covered cable, due for the scrap heap next year, connected to newer rubber-covered wires."
Basically, the system is so old that an incremental retrofit is very complicated to achieve without full shutdown. Remember the overall NYC subway system is the only train system that actually operates 24-7 so maintenance scheduling is also much more involved.
Good one. They routinely shut down lines and stations for hours/days at a time. The L got shut down between Bedford & 8th Ave for the entirety of Memorial Day weekend. Even when lines are running perfectly, at night they only run once every 30-60 minutes. To riders the changes feel arbitrary and are impossible to predict. I've been stuck dozens of times in random places because I tried to use the wrong line at the wrong time. The only real way to know there's a problem ahead is to have the privilege of riding that line on a regular basis and reading the signs they post. If you look around almost every station will have posters denoting some change that's ongoing or coming up.
Also entire train lines frequently run in parallel a few blocks from each other.
And in fact Google Maps does a decent job of scraping it as well. You just need to remember that when Google Maps wants you to go to Jay St. Metrotech instead of High St it might not just be because it thinks it's 300m closer.
It always seemed strange to me that Philly is the only city I've been to that fully replaces the subway at night with buses.
No, it shouldn't, and I take it by this statement you don't live in NYC. I do, and have lived in Tokyo and other cities with excellent mass transit. While Tokyo's system is much, much better, it's pretty fantastic that I know I can always get a train home no matter what time it is, no matter where in the city I am, much faster than any ground vehicle would take me.
This is a decent compromise.
Chicago's subway is 24/7, too.
Second, MTA estimate about 16 miles of track could be upgraded per year. They have 665 miles of revenue track (850 including non-revenue), so it would take 41.56 years just to convert the revenue track. The Regional Plan Association wants MTA to convert 21 miles of track per year, leading to 31.66 years to cover all the revenue track.
Add the time to create new rolling stock, any additional time for any additional track in the next 30+ years, and extra time in case they go over the original estimation. Easily between 35 and 50 years just to convert the revenue-generating track.
https://en.wikipedia.org/wiki/Signaling_of_the_New_York_City...
Actually, it isn't even all post-2000s trains. The CBTC [2] train controls aren't even on all of the post-2000s trains. In fact besides the 'L' train which has already been converted, only the 7 line has all of its cars as CBTC [1].
This is really bad news, because ideally, the very, very crowded 4,5,6 lines mentioned in the NYT article should be the lines to have the signals computerized, but the 4, 5 trains are relatively "new" having been put in service in 1999-2003 or so. Some of the trains in service are > 50 years old.
[1] https://en.wikipedia.org/wiki/New_York_City_Subway_rolling_s...
[2] https://en.wikipedia.org/wiki/Communications-based_train_con...
50 years might be an over estimate, but projects like these tend to slip their deadlines.
[Edit] peterwwillis's answer is much more thorough than mine https://news.ycombinator.com/item?id=14948951
If trains normally average, say, 30mph, and 12 times per hour in one direction, a 0.5mile restriction adds 5 minutes to the journey time. Now we can only run 11 trains per hour -- which messes up the whole schedule.
The periods where there isn't a train passing will be quite small. Is there time to get any necessary equipment onto the track, start the work, then clear the equipment away before the next train is approaching?
What happens if the staff make an error, and break the existing system? It might not be possible for trains to move, in which case we now need to evacuate hundreds of passengers along the tunnel.
Work within metro tunnels while trains are running is, therefore, very unusual.
2) Downtime basically shuts down the city. Even nights and weekends interruption in service causes major disruptions. The surface streets are at maximum capacity, there is no way to get that many people in and out of downtown and midtown without the subway.
Because currently, the residents would riot over the taxes/fees cost of redundancies required to enable faster maintenance and upgrade projects of a 24x7x365 operating system, where the pain of maintenance is constantly deferred until it turns into a looming, critical safety-liability issue. Back when the population density was lower and the pace of life slower, and less economic dependencies upon this infrastructure, the disruptions were affordable and more palatable, but now there are likely powerful stakeholders pressuring the Port Authority from taking as many outages as they'd like these days, comparatively. When I used to live in NYC, the Port Authority took a lot of abuse from a lot of different quarters for every line shutdown for planned maintenance. Increases in fares to fund future expansion/maintenance was met with a lot of resistance. They were like sysadmins for NYC.
Any talk of use pays is met with outrage about how low income people out in the boroughs couldn't afford it, so the whole system continues to operate as a horribly inefficient welfare system for poor people to get to underpaid jobs in the city, instead of a transit system. It would help a lot to double (triple?) the fares overnight, and give the poor people out in the boroughs a free metrocard - at least that way you're capturing the value provided to the rich people and tourists all the way through manhattan and brooklyn.
Caltrain is on year 5 of their "3 year" project to modernize their signaling system... and that's a relatively simple 75 mile system with 30 stations and it's almost all above-ground.
Hard to prove this is the case, but it smells right to me. Modern signaling system that did nothing but give arrival times to the public would not have to make use of any infrastructure at all -- it could run completely independently -- and could be done for a tiny fraction of the billions of dollars that the MTA is spending on the slow work they say is currently necessary to get it.
I can completely sympathize with the difficulty of upgrading 24/7 critical infrastructure, especially given that mistakes can kill or injure people. I'd try to just deploy separate parallel systems instead.
At a comically reduced scale, businesses migrating between ERPs (or similar line-of-business apps) often run both the old and new systems 'side-by-side' for some period of time. What I've never seen or heard them doing is trying to replace components or sub-systems of the old system with those of the new system. That kind of integration work would be awful and would probably drastically increase the odds that the migration would crash and burn.
As you point the integration work for this is complex and is usually the primary driver of delays and cost increases.
While CBTC signaling is being installed, the original fixed-block signaling remains in place. It's nearly impossible to do this otherwise - you'd have to shut the entire line down for the entire time it takes to install new signals - which could be years.
Once the new signal installation is complete the two systems may operate in parallel (with the fixed-block system acting as a possible backup if CBTC fails, and also so older trains can still run).
The issue is that with 24/7 operation, there is no consistent regular time where work like this can be done. It can only be done in short spurts (late-night shutdowns) or the work crews in-lined with train service, which has obvious safety concerns as well as drastically reducing the capacity of the line.
If an individual's car breaks down, they can find alternate means to get where they need to go. If everyone were to depend on public transit in the future, how do you handle upgrades? I know the metro in DC will run extra bus routes for some down trains, but I think that's just for certain smaller repairs.
It's something I haven't really thought much about before. The simple answer is to have redundant equipment (tunnels, tracks, cars), but few would stomach the cost. Most likely it would just get used instead, in the same way that you can never alleviate traffic jams with more roads, you just get more people using them.
The NY Subway is just the most incompetent, most mismanaged, most technically indebted subway on Earth.
There is no "problem with mass transit" as much as it is a problem with centralized administration of complex things, period. Anything of large scale that impacts many lives but has limited controllers to manage it is both rife for ineptitude / corruption / incompetence and easily ignored on the consumer side because of the complexity.
The same issue turns up all over infrastructure - outdated bridges, power lines, internet infrastructure, water pipes. Central authorities of incompetent taxpayer dollar rent seekers run them, the people are too ignorant / ill informed about deteriorating conditions to care, legacy technical debt builds up over centuries to be impossibly large.
And you won't escape them. The inverse of your scenario - rather than the car breaking down, the road collapses from age - is still wholly applicable. Car travel and vehicular routes are just as mired in corruption and bureaucracy making them a nightmare as trains. Trains breaking down is as easily solved as cars - there are maintenance stations, you take one train off, you put a new one on. The real problem is always when the tracks go bad - the centralization part. You could have a billion trains but not enough track / switching capacity to use them.
The period depends on the city. Here in Copenhagen, where the metro runs all night, they tend to shut part of a line from 00-05h on a Monday-Thursday night, and put on buses instead. Cities with bigger metro systems might not need the buses: this was the case the last time I visited Berlin, and a central section was closed overnight.
London sometimes closes parts of lines at weekends, and every 2-3 years or so there is major work on a line (closed entirely) on ~25-30th December.
(To be clear then: the "absolute worse case" is closing an entire line for around a week.)
Engineers and other staff can work at weekends / nights / popular vacation times / public holidays, but at an increasing cost. There's also a limited total number of engineers, so it will help to have a steady amount of work (i.e. permanently employed staff).
They don't have these problems in London, Tokyo, Hong Kong, Singapore.. it's not a problem with subways, it is a problem with the MTA.
Given that your premise is that everyone is on transit, presumably some of the incredibly gargantuan subsidies that are handed to private vehicle drivers would be used. I don't know if it's the just-world fallacy or what, but people always seem to have trouble grasping truly how inefficient car travel is. In a situation where gov't doesn't heavily subsidize them (and the drivers aren't paying the high costs associated with cars), I can't imagine that the cost of redundancy equipment required for no-downtime upgrades would be un-stomachable.
On the other hand, the other thing I know is that the electorate is far too stupid and far too selfish to grasp simple concepts like this: my own city has to fight tooth and nail against car drivers as a political bloc in order to claw back a fraction of the outsized privileged position they have in the transit infrastructure. So you may be right that it won't be politically feasible despite being less expensive than the alternative.
The best innovation often happens when working under constraints; often a drive for profit results in better service for everyone using the infrastructure. Of course this isn't the case 100% of the time, like your example of medicine, which is why I think that to get the best of both worlds you need a mix of government regulation with privatized capitalism. But I think it would be incorrect to dismiss the profit incentive entirely as being bad, and probably in the case of US infrastructure we would benefit from more privatization and not the other way around.
[1] http://money.cnn.com/2015/03/30/news/hong-kong-mtr-subway-pr... [2] http://www.newsweek.com/post-office-aint-broken-its-profit-s...
http://www.govexec.com/management/2016/02/usps-records-first...
Another is the issue of correlation/causation. Well-run systems may tend to be efficient in their use of monetary resources (almost by definition), but it's not clear that setting a for-profit goal will be a cure-all intervention that causes a system to be well-run.
It's also a big leap from setting profit goals to full-on privatization, which I'm skeptical of for several reasons. Private companies are often only pushed to be "good enough", better than the competition. A public transit system that is just barely better than a cab (say for daily work commute) is no good at all. Private companies tend to have short-term incentives, for instance, the CEO may get a bonus based on the current year's profit, which will be destroyed by investment in infrastructure. Companies care about maximizing revenue rather than welfare. Etc.
Most railways in Europe and North America were built for the profit of their investors, and made a profit for a long time.
Before that, so were some highways, the canals, and many bridges.
In Britain, the railways were bankrupted by WW2, and afterwards consolidated into a national company (British Rail).
Transport for London (IMO the complete opposite of MTA: on the whole incredibly well run and generally well funded) has went from making an enormous operational loss to near break even in the last 15 years. If the trends hold it is projected to make a >£1bn operational profit per year by 2021.
NB I'm talking about operational expenditure not capital, which is funded from grants from govt, which currently stand at around £3bn per annum. It's possible to see how it could be entirely profit generating in a couple of decades though Inc capex. Assuming everyone doesn't leave due to brexit.
[1] http://web.mta.info/nyct/facts/ridership/ridership_sub_annua...
[2] http://web.mta.info/mta/news/books/archive/160725_1030_NYCT.... <-- See page 29
> Subway ridership has risen dramatically since the 1990s, when about four million people used the system each day. Now it is nearly six million riders each day — the highest level since the 1940
https://www.nytimes.com/interactive/2017/06/28/nyregion/subw...
[1] https://www.nytimes.com/2017/02/23/nyregion/new-york-city-su...
If it is an issue with the strength of the train engines, could you use two train engines together? Especially if their intended routes are just getting cancelled.
https://www.nytimes.com/2017/05/01/nyregion/new-york-subway-...
30s! And maybe even older!
If those are net-costing anything at all, I'd guess it's a rounding error on any subway upgrades.
Also, you are taxing the poorest. I think they struggle enough. You could start selling premium services though.