Not the one I worked in back in the early 90's. You could walk along to rolling line and had to hit a pause button to stop the feeding of billets in the reheat furnace to cross the line to the other side of the plant. Nucor Plymouth.
(For those of you who don't know what this is, each electrode is a graphite column one or two feet in diameter and about 20 feet long. Replacing them took two guys, selected for their resemblance to linebackers, and had to be done multiple times each day.)