The result is a balancing act — drain as much water as possible as quickly as possible while trying to minimize further damage to the spillway. The main spillway was returned to action, but at reduced capacity compared to what it could normally do under the current conditions. After all, the spillway needs to last for the remainder of the rainy season.
The stated capacity of the main spillway is 250,000 cubic feet per second, once it became clear the emergency spillway was not holding up, they increased the main spillway to 100,000 cubic feet per second. So limiting damage to the main spillway is an ongoing concern.