See pic: http://s4.reutersmedia.net/resources/r/?m=02&d=20170213&t=2&...
I believe they're worried about the erosion tearing apart the hillside and thus destabilizing the entire hill; at which point the whole hill would just collapse.
Google "Major sinkhole on spillway at Lake Oroville" to avoid the paywall.
http://www.latimes.com/visuals/photography/la-me-lake-orovil...
The lake near my house was down 120 feet. You could see land and structures never seen in decades. Prime opportunity to get in there to inspect and maintain said infrastructure. Not sure anything was done at all.
I am no expert in concrete but I would like to think the break in the Oroville spillway could have been detected and dealt with with cursory inspections over the last several years, when access was easy due to the drought.
I don't like it when folks are put in danger because other folks who are supposed to be working for us don't do their jobs. Not saying this is what's happening here, I don't know, but the question needs to be asked.
They share the data about the level of the reservoir:
http://cdec.water.ca.gov/histPlot/DataPlotter.jsp?staid=ORO&...
The wet season last year basically filled the reservoir up from its lowest levels. So a project started in the middle of 2014 would need to leave the system operable by December, and they have that same ~6 month period in pretty much every year.
Nobody ever seems to do this. We always wait for disasters before fixing or maintaining anything. This, despite the fact that we pay taxes, plenty of taxes, to fully staff, train and employ departments with thousands of people who are supposed to actively be looking after these things.
It's the infrastructure equivalent of a sysadmin who never looks after security and then, when all hell breaks loose, proclaims we need to do something about security.
There's lots of possibilities. Maybe they didn't do inspections last year. Maybe they did inspections and noted damage that did not yet warrant repair. Maybe they did inspections and missed damage. Maybe they were unable to secure funds to repair the damage. Maybe the damage was noted too late to do repairs last fall. Etc.
The thing to do is wait and see if they come forward with a reasonable explanation of what went wrong and then feed that information into the maintenance plans at this dam and others.
In other words, the idea that things could go bad once lots of water came back isn't a far-fetched concept. Yet we are reactionary. We don't seem to spend any time a-priory to try and get ready for such events. History is full of such fuck-ups.
This was the first time the spillway was EVER used in its existence; for all we knew at the time, it would have never been used.
https://www.google.com/maps/@39.5400137,-121.4931958,3617m/d...
Also: the top 70 meters or something is still a lot of water!
It would still be a catastrophe, the outflow will go from inches per hour to feet per hour.
Downstream destruction is of concern because that entire region depends on flood control. The habitability and agricultural production of the corridor between Oroville and Sacramento relies upon, and was created by, the flood control of Plumas, Yolo, Butte, etc counties. There are a number of canals, diversions, and reservoirs both above and below the Oroville to further control flow the dam as it reaches our rivers. However, most of the re-routing is also man-made and thus untested for such an event.
For the main service spillway, the main concern is that the flow of water will cause erosion damage upstream of the existing damaged site[1]. If the damage to the concrete continues up the spillway to the top, it could render the spillway inoperable.
For the emergency spillway, the main concern is that a continued flow of water would erode the soil off the hill to the point that the hill would no longer support the spillway (the concrete lip at the top of the hill). If this happened, the spillway would fail. The effect wouldn't be as severe as if the dam failed (because there would still be a large hill in between the water and where it wants to flow), but the erosion along the path of the water would get out of control pretty quickly.
Dirt hillsides are not designed to have 100,000 cubic feet of water rolling down them. They tend to erode extremely quickly and can quickly turn into uncontrolable discharges if the lip erodes.