Sweden reveals results from pilot of 30-hour work week
bloomberg.com
bloomberg.com
Nurses worked between 5 to 7 hours on day shifts resulting in a 30 hour workweek. Night shifts was 6 to 8 hours.
I think it is important to stress this fact that it was about workweek and not workday. Almost all media reporting on this (Swedish as well) misses this fact. You have to read the report to get that.
Personally I rather work more one day and less the other. It is the flexibility over a week that is more interesting than over a day.
report after 18 months 2016-10-11
https://sverigesradio.se/diverse/appdata/isidor/files/104/75...
In Sweden, 6-hour workday is a well known political slogan, probably why that was used.
After downloading the aforementioned paper and uploading the to google translate, since I don't speak Swedish:
> Summary 18 months with 6 hours
> 6 hours of trial
> City of Gothenburg decided in 2014 to conduct a trial with 6-hour day with follow-up research. The trial started 2015-02-01 and 2016-12-31 terminated after 23 months. The trial will answer the question about the effects of reduced working hours have for nurses, tenants and the economy / jobs.
> The trial has been shortened working hours to 6 hours per day and 14.9 full-time employees, 17 nurses have been hired to compensate for reduced working hours. Consequential changes have made of schedule at Svartedalen center for the elderly. To provide a high comparability has no other changes made by different senior housing from others. In follow research studies 100 % Of nurses participated.
...
> There are 29 sessions on a six-week period in the new schedule. Three of the six weekends included. Employees at Svartedalen work in the trial between five and seven hours on daily schedule. In practice, between 6 hours and 6.25 hours (6 hours and 15 minutes). That it not exactly six hours per day due to scheduling must answer received business needs.
> Night schedule is at least six and no more than eight hours. Before the experiment was working nine hours on overnight.
So yeah, the resulting full-time hours were 30, but the study was specifically interested in 6-hour work days, according to the report. The only reason it wasn't exactly 6 was for business/logistical reasons.
The person you are calling inaccurate said as much in different words.
If it wasn't exactly 6 then you shouldn't call it 6.
It does say 5 to 7 hours and looking up other Swedish media that have reported on the length on shifts they also say 5 to 7.
http://www.aftonbladet.se/nyheter/article22726117.ab
http://www.gp.se/nyheter/göteborg/sextimmarsdag-på-äldreboen...
http://www.fria.nu/artikel/119894
The report itself is a bit vague what it actually means by in practice.
Full explanation ->
From the report with Google Translate
> Full-time dimensions in the study is 30 hours / week compared to normal working hours at 38.25 hours in the daytime alternatively 37.00 hours (depending on working agreement at the time of appointment) and 36.33 hours for the night.
So the report clearly states 30 hours/week as "heltidsmått" (a measured full-time). Not 6 hours/day.
What about "in practice"? If you look at the first report after 6 months
http://goteborg.vansterpartiet.se/files/2015/10/2015-10-07-6...
Page 6, two tables of example schedules, one to the left before the pilot and the right during the pilot. Remember that a work day includes a free 30 min lunch break so there is a difference between the two columns Period and Timmar (Hours) for 0.5h except the night shift, no free lunch there!
As we can see all day shifts are either 6h or 6.25h during the pilot.
So what about the 5 to 7 hours? I think that is the range what the pilot accepts as "6-hour" workday measurement, i.e you have to have min-max otherwise you could put everything on two days.
Found in the summary after 12 months slide 8
http://we.gu.se/digitalAssets/1574/1574441_2016-04-21-1445-s...
Left column, the Trial 5-7 hours/day as "ram" (frame, within these numbers, budget)
But in practice the schedule ended up as 6 to 6.25h. I guess to try to be true to 6-hour workday ideal.
Note: working hours in Sweden is regulated to 40 hours/week.
https://www.av.se/arbetsmiljoarbete-och-inspektioner/lagar-o...
New note: one of the political parties behind this pilot, the Left party, calls the pilot "six hour working day/30 hours working week". That should keep it covered!
http://nyheter24.se/debatt/767075-pilhem-v-darfor-infor-vi-6...
https://www.bloomberg.com/news/articles/2017-01-03/swedish-s...
Which is why this is very close to just propaganda against a 6h work day.
That shouldn't be shocking either - each shift change requires people to scrub in, pass on information from the previous shift, and so on - but it's a deeper question than adding new staff to cover the missing hours.
I wonder if there's a balance somewhere here too. Perhaps have employees work 7 hours at a slightly reduced rate.
This trial alone is probably difficult to draw solid conclusions from, other than to say if these employees work less they produce less (albeit not proportionately it seems).
1: The Rise and Fall of American Growth, by Robert Gordon.
"Preliminary results concluded that it achieved all of these aims, but the city had to employ an extra 17 staff, costing 12m kroner (£1.4m), Bloomberg reported."
Am I missing something because that seems painfully obvious without even having to to undertake the experiment no?
That being said I absolutely love that the Swedish government was willing to entertain such an idea and undertake such an experiment.
I'm a huge fan of the idea of shorter work weeks, it's obvious that some jobs won't be able to introduce them without cost. Also, assuming Sweden and Denmark aren't to different at this point, there might not actually be enough skill people walking around without jobs to fill in the gaps in the sectors where people are required to be present, regardless to productivity boosts.
That extra day off would do far more for people than one or two less hours every day. So 4x8=32 hours, vs 6x5=30 hours. I would even bargain for 4 days/9 hours, or 4x9=36 hours.
That third day is huge. It's the difference from having only enough time for some leisurely weekend activities, to having enough time to take a mini-3-day-vacation every week (short flights, etc.).
Now that I have kids and work an office job, I would much prefer a 5x6 to a 4x8.
Why not? You'd get to spend more contiguous time together.
But as someone without kids, being able to take short flights or trips every week over 3 days would be awesome.
I guess ideally, since 5x6h and 4x8h are only two hours apart, a utopian workplace would offer its employees either option -- the people who chose 4x8h would make 2h more wages weekly.
If I wanted, I could work 4x10 (With some sweet talking to a manager perhaps). I'd very much prefer to have 30, 32 or 35h to distribute over the week though, it would make the planning a lot easier. In that case I'd do e.g. 5x6 now that my small children needs early pickup, but I'd go to 4x8 when I have larger children who can bike home from school, so we can go on a weekend trip with friday off.
Of course, if everyone works 4 days a week and has the same 5th day off that advantage goes away I suppose.
During the past year, I've actually started trying this out. I've taken a couple of my vacation weeks and spread them out - instead of taking one week vacation, I've taken Fridays off for five weeks. It's been amazing. Somehow it feels like that extra day counts twice: your weekend gets one day longer, and your work week gets one day shorter!
It does mean the week is more compacted and there's less time spent "twirling your thumbs", but it's a much better schedule over all and we continue to produce great work.
I'm more curious to see the results of Amazon's 30 hr work week because I believe that includes developers.
If I were being grilled I'd consider a new job.
IMO, anything that doesn't include being at work as part of your actual job duties should have no number of required work hours. You either get enough work done or you don't. If you aren't getting the expected amount of work done, then you'll eventually get fired. If you can out perform everyone else on the team and work 8 hours a week, so be it(just don't expect to get any brownie points when it comes raise time unless you put in more time).
Things like retail/food service are obviously things that require being at work certain hours so talking about shortening hours for that time of work is productive. For creative work/management/executive work though, I think we should move to a more flexible approach.
As a developer, a majority of the companies I worked at there was no incentive to go above and beyond, even at the end of the year in terms of bonuses. Sure, the guy that was burning himself out for that extra 1% yearly raise usually got it, but it never made any sense to me to work that hard for a few more pennies over the year.
Now in my 30's, my attitude is to get my stuff done and stay off my managers radar. My sanity and work/life balance is too important at this point in my life.
Where I work (software/hardware for research) the basic principle is actually not different: boss doesn't really care what I'm doing as long as I'm not unhappy and the stuff which needs to get done gets done in time. Sure there are no fixed periodic deadlines or money-based quota, but the same principle nonetheless. I wouldn't want to work in another way because of all the freedom it gives you. I do see the same 'drawback' regarding carreer opportunities etc but the older I get the less I care. I earn enough money to sustain my lifestyle so yeah I'm definitely not going to work my ass off just to earn a bit more or get a better position, as I know that won't make me any happier anyway.
how do I know how much work is enough?
If I gauge by productivity, that's cool... I'll just be really fast and get my stuff done and then go play banjo or whatever.
But then when folks hand me a crufty WordPress site that is misbehaving and it could be anything between "visit the route that resets the route cache" and "debug three or four broken and unfamiliar JavaScript libraries and their interaction with terrible PHP code" there is a problem, because to my boss those could be the same amount of work.
When I am doing green field work, or working with very nice, clean technology that I understand well, it's easy enough for me to have expectations about how much to do, even (or perhaps especially) when I am dealing with a large, multi-month effort where there is a lot of fluidity in hitting specific goals.
But how do I say "oh, I worked enough today" if I don't have an hourly commitment? I agreed to a certain period of my time specifically because sometimes I look up and have worked 8-10 hours.
I'm the only programmer on my team, by the way, so there aren't a lot of metrics we can pull from about performance.
This is a real question I think about a lot, and I'd be happy for an answer: how do you set a workload expectation with no reference to how much effort or time I am expending when time estimation is difficult?
Of course, over time your output averages out, and if you work about as hard as someone at about your skill level you'll have similar outcomes. This works ok for yardsticking at engineer-heavy organizations. Doesn't solve the problem for a solo developer like you though.
If a sales guy commit more features to the customers than reasonable, do you need to put in more hours to "getting the work done"? Does he need to stick around late till your are done to penalize him also? If a sales guy doesn't make a sale as aniticipated does he need to stick around until he makes a sale and "gets his work done"?
Unfortunately, businesses and companies are mostly concerned about output. Does the line below sound familiar?
> I don't care how you do it. Just get it done.
It's a very small company with doing web dev projects; there's only the boss (who pretty much just does sales), the "Design Dept. Head" out in SF, the "Chief Project Manager" in Az, and me (I'm an hour outside of Austin), plus a couple of off and on freelancers.
TBH, the expectation is mostly that "we get stuff done"; for example I had to meet with a client for a sub-contracted NSF gig on our NYE holiday. Or I have had to fix broken stuff in the middle of the night/ work late to make some magic happen occasionally. That has been rare enough so that, like the once or twice a year I have to travel, it's novel and kind of fun.
But between the limited sales pipeline, higher-margin clientele, and being fairly efficient the formal office hours that I agreed to are easy to maintain.
I play a lot of music, and I suspect that it's very much like being in a successful band would be like (I wouldn't know specifically what that is like, though, I only gig on the weekends at bars).
I'm taking this example. This is mine now. Thanks. :)
Additionally, the 40 hour week protects people who got a difficult task from being held over. I realize there are stories of working 80 hours a week, but in my experience most people leave at 40 hours, which forces managers and sales people to set realistic delivery dates based on those hours.
At the same time though, sometimes you can learn a lot by not being available. There's documentation that can be written, and sometimes users need to actually read the manual instead of interrupting you to answer a question you've already answered to them three times before.
Sigh. That last one is the worst. Especially if you've written documentation, pointed it out to them before, and been told "I don't have time to read that".
Possible that costs might vary from role to role, but that's less satisfying if the goal is to improve life.
OTH, back when I was paining houses and hauling ladders around all day, I felt like sitting down in front of a computer for the rest of the evening after finally getting home.
I hope you're joking, otherwise you don't know Amazon at all. (source: I worked at AWS for six years)
https://www.washingtonpost.com/news/the-switch/wp/2016/08/26...
I would've stayed at Amazon longer if at the end of the year instead of paying me more money they would've been willing to just make me work fewer hours.
When I read about this in The Guardian way back when, they mentioned three other cases:
Brath
For Maria Bråth, boss of internet startup Brath, the six-hour working day the company introduced when it was formed three years ago gives it a competitive advantage because it attracts better staff and keeps them. “They are the most valuable thing we have,” she says – an offer of more pay elsewhere would not make up for the shorter hours they have at Brath.
The company, which has 22 staff in offices in Stockholm and Örnsköldsvik, produces as much, if not more, than its competitors do in eight-hour days, she says. “It has a lot to do with the fact that we are very creative – we couldn’t keep it up for eight hours.”
Toyota
At Toyota service centres in Gothenburg, working hours have been shorter for more than a decade. Employees moved to a six-hour day 13 years ago and have never looked back. Customers were unhappy with long waiting times, while staff were stressed and making mistakes, according to Martin Banck, the managing director, whose idea it was to cut the time worked by his mechanics. From a 7am to 4pm working day the service centre switched to two six-hour shifts with full pay, one starting at 6am and the other at noon, with fewer and shorter breaks. There are 36 mechanics on the scheme.
“Staff feel better, there is low turnover and it is easier to recruit new people,” Banck says. “They have a shorter travel time to work, there is more efficient use of the machines and lower capital costs – everyone is happy.” Profits have risen by 25%, he adds.
Filimundus
Linus Feldt, boss of Stockholm app developer Filimundus, says the six-hour working day his business began a year ago is about motivation and focus, rather than staff simply cramming in the same amount of work they used to do in eight hours.
“Today I believe that time is more valuable than money,” Feldt says. “And it is a strong motivational factor to be able to go home two hours earlier. You still want to do a good job and be productive during six hours, so I think you focus more and are more efficient.”
Source: https://www.theguardian.com/world/2015/sep/17/efficiency-up-...
"Still, the added hiring by the municipality has helped the coffers of the national government by reducing unemployment costs by 4.7 million kronor during the first 18 months of the trial due to new jobs, according to the interim report."
I need a more detailed analysis. If generalised, this would significantly reduce unemployment. We could thus lower the unemployment insurance rates. I've seen predictions this basically balances out: we can sustain the current effective salaries at no cost.
The way this is presented here, this theory appears to be false. Does it? I'm sure we can draw a more definite answer, but this article is not enough.
Well, if you put a low enough price on people's happiness, health, and quality of work, then yes I guess.
Anyway: I hope the people involved in the pilot and happily doing 6 hours shifts now, won't take it too hard if the pilot should be stopped and they're back to 8 hour shifts.
I'm more in the latter camp and my colleagues and I have been talking about doing 4x 9.5 hour days and just rotating who gets Friday's off vs the rest of the week. I could easily come a bit earlier, leave a bit later and get tons of benefits from 3 day weekends.
It seems like the experiment was concluded as planned in the end but they still tried to end it early.
https://www.theatlantic.com/video/index/396527/case-32-hour-...
Pros:
- three-day weekends all year long
- 20% less commute time
- magically enforces the "Read-only Friday" rule
- if I have to handle an emergency on Friday, it means overtime pay
- Friday is good for running errands
Cons:
- clients/coworkers still work on Fridays, so I can't ignore my email entirely
- occasional meetings happen on Friday
This is probably not a good schedule for everyone, but I have been working it for 2 years now and I like it a lot. Although none of my coworkers are following this example...
These kind of nursing jobs in public sector is low wage and high work load, no regulation on formal training, but usually some sort of grammar school education. 97% who works with it are women.
What the public employer want to do here is to use the number of work hours, instead of high salary, to attract young people. Thats the long term scheme.
Wages in public sector in Sweden is falling behind private sector more and more. You can get more paid to clean someones apartment than a newly educated registered nurse with proper training from a university gets when signing up for work in the public sector.
Lots of young Swedes go to Norway and work there instead and get much better pay.
I agree with other commenters, this smells of politics more than economics.
I work in a healthcare system with 120,000 employees. Let's say we reduced hours to 6. Using the Swedish numbers, that would cost our organization $2.6 billion dollars, or roughly 10% of annual budget.
Some UBI proposals aim to replace all of the current welfare systems with one UBI system that costs the same. (That wouldn't be what happens, but let's consider it for the sake of argument.) Those proposals have to limit UBI benefits to an amount that is below a living wage in order to stay within the budget of the current welfare system, assuming everyone receives the same amount of money (that's the definition of UBI, and any system that gives different amounts to different people is not universal or basic.)
Plus, the government's budget would have to shrink if tax receipts drop, which they would clearly do if lots of people chose to live off UBI instead of working. So even the non-living-wage UBI proposals are probably unrealistic.
UBI seems like a good idea at first, but it seems less attractive the more you look at it.
- I work to my own schedule. There's no artificial start time. If I feel like I've got something to contribute at any point I sit down and do so. If I feel inspired or get in the zone I'll do 6 or eight hours, if I don't I'll do none, or just a couple of hours.
- Conversely, if I don't feel up to it, uninspired, tired, whatever, I can stop. Taking a break/nap and coming back to something is incredibly valuable.
- I'm so much less stressed than when I was working an 8 hour job. Way more relaxed, so my mental state overall is way better.
- If I sit down and program/operate for 4 hours I spend the rest of the day effectively letting my brain churn on problems. I'm still thinking about the problems that I am working on, I have way more "shower moments".
6 months ago I worked an 8 hour per day job (from home still) and my own personal observation is that I'm way more effective in 4 hours now than I was in 8 at my old job. I feel productive.
This might not work for other people obviously, maybe I just need/like a larger proportion of my time to be thinking time over implementation time.
I'm lucky in that I can work the hours I need to work. Last week I did days that lasted 4, 6, 1.25, 1.75 and 4 hours (the 1.x days I had other stuff on).
To begin with, as noted in the article by having to pay more people, it removed some from unemployment. That as noted in the article basically halved the cost of the extra cost.
But hold on. Someone removed from unemployment doesn't just sit and look pretty. Unemployment benefits are usually nothing to write home about compared to an actual wage and where previously one could just subsist they newly employed individual could now Consume much more strongly. Consume in this case means buying tomatoes, buying starbucks, buying cinemas tickets, buying dresses and whatever. All this stuff moves the economy.
The question is then, has the economic impact of all this economy moving been taken into account?
This was done in one municipal workplace with a few dozen employees.
Submitters: please don't submit an article that's clearly lifted from another publicly available source. Submit the latter instead. This is in the site guidelines: https://news.ycombinator.com/newsguidelines.html.
100% they knew the cost. The outcome was :
>The take away was largely positive, with nurses at the home feeling healthier, which reduced sick-leave, and patient care improving.
While we are headed to super automation and the reduction of workforce (And a stagnant or growing GDP) it is either free money for the non-workers or reduced work hours. It's Jetson's again.
In short: http://nesma.org/2015/01/programmer-productivity-is-waste-of...
If every business was required by law to have a tea lady (or man) per every 50 employees it would not make any business uncompetitive, and would be sustainable, and it would reduce unemployment, and I'd get a cuppa.
Edit 1: 9-6 is 9 hours -_-
Everybody would.
9-6 is 8 hours + lunch, aka a standard work day.
I think workday hours are similar to American employees, but work less in the weekends and have more vacations.
Why?
It's astonishingly common for my French counterparts to "arrive" at there computer at 10:30 each day and head out the door shortly before 17:00. Not to mention the 1.5hour or so lunch they tend to take.
This is a sample of maybe 20 people, and maybe it's a culture of the company more than the country, but I've noticed they like to shake hands with everybody on the floor before starting their day, and they also like to take a coffee first and have a chat. For me though, I operate "remote" and when they are not available on Lync/Skype then they may as well be not working because they're.. not.. working.
it is a stark contrast to my team who are jacked in before 9, and save for a few hourly strolls to the canteen and lunchtime do not leave until 18:00. (unless something breaks then we stay, which is common in crunch times.)
I do work with people from both our Swedish and French studios and I can definitely confirm what you said, both ways.
[0] http://www.bbc.com/capital/story/20140312-frances-mythic-35-...
[1] http://ec.europa.eu/eurostat/tgm/table.do?tab=table&init=1&l...
It's also possible to get 38.5 or 40 hours contracts, where you would get extra holidays to compensate (over a year).
I've worked as a programmer in France, Canada and England. In my experience France and England are pretty much the same in terms of work-time (8 hours/day, 5 week holiday), Canada is behind by lack of holiday (8 hours/day, generally 3 weeks holiday)
Edit: bare in mind this is based on my experience and will presumably be very different depending on the employer.
5 weeks x (5 days / per work week) = 25 days off
or
5 weeks x (7 days / per week) = 35 days offContracts always state the period in days, or hours for part-time workers, but it's normal to divide by five and say "weeks" in conversation.
[0] https://en.wikipedia.org/wiki/Working_Time_Directive_2003
In engineering/programming/etc. you either have such a contract or often unlimited hours contract (so the only limit by law is something like 72h/week, IIRC), and, in practice, you generally do about 45 hours/week. It doesn't matter if you have an unlimited hours contract or a nice strict 35h contracts: you'll work 45 hours anyway and your 10 extra hours per week will not be paid. And when I say they are not paid, I don't mean they are just not paid more than the regular ones, I mean they are not paid at all.
Only in large traditional companies, the extra hours are counted and either paid or exchanged for extra vacation. But large companies have now outsourced most of the work to subcontractors, which use unlimited contracts or simply do not give a fuck about respecting the laws and are small enough so that there is no union. And anyway, go and try to unionise engineers/computer scientists...
Except there's no mention of the greatest benefit: improved quality of life for all participants.
The only downside was, ironically, on holiday weeks, because the holiday pay was only 8 hours, which resulted in still having to work four shorter days, and often screwing up a long-weekend cycle.
Obviously bumping salaries by 1/4 is not reasonable.
In order for costs not to outweigh benefits that clinic would need to be some kind of utopia...