This should help a lot. When I worked in the rail automation biz (for a 100B multinational) the internal heuristic for people transport worldwide was two heavy commuter rail lines were the equivalent of a 24-lane highway all parameters being equal (which they never are: there were tons of planning formulae brought to bear when making projections).