"Chart 1- History of Residual Stranded Debt & Unfunded Liability of OEFC" seems to show a decreasing number:
* https://www.breckenhill.com/blogg.php
There is of course a lot of political history (OPC, LPC, etc) that makes the whole situation messy.
> A new framework was created where this stranded debt was paid off as a forced separate line item on everyone’s bills.
The Debt Retirement Charge was $0.007 or 0.7¢ per kWh.
I did find this (potential?) $100B number on Ontario nuclear energy:
* https://archive.is/https://www.thestar.com/politics/provinci...
but if you take that number and 'ammortize' it over the average 40-year life span of reactors, it comes to $2.5B/year (in capex), which is about ~1% of the provincial budget. I'm not sure how much raw GW capacity that would add, or how many GWh would be generated annually, to do the math on the per-kWh (capex?) cost.
The article goes over the pros and cons of various points in the energy mix debate.
The debt from nuclear construction was being paid off then, just like it is being paid off right now: OEFC holds the debt and has revenue to pay it off. An article from someone who is not a fan of nuclear, but is also not a fan of Harris's non-sense:
> Harris claimed Hydro was so badly in debt as to be bankrupt. This claim was proven false by the final Ontario Hydro financial report in March of 1999 which showed that $1 billion of Hydro’s debt had been paid down and was on track to be paid off in 20 years. At the time critics said: “wouldn’t we all like to have a 20-year mortgage on our home because then you have an asset that serves you well!”
Even speaking with passengers has been shown to increase traffic incidents:
* https://www.sciencedirect.com/science/article/abs/pii/S13698...
* https://journals.sagepub.com/doi/10.3141/1899-15
* https://crashstats.nhtsa.dot.gov/Api/Public/ViewPublication/...
It's a debate spectrum / sliding scale on how society wants to go, but at the very least one should be aware of the risk factors and be mindful of where your attention is.
* https://www.youtube.com/watch?v=Lq1ksVVeRWI
* https://historyforatheists.com/2025/04/interview-dr-ada-palm...
Other interesting interviews: the historicity of Jesus of Nazareth with Bart Ehrman and also Thomas Schmidt (using Josephus' Testimonium), the date of Christmas with Philipp Nothaft, 'pagan origins' of Easter with Andrew Henry (Religion for Breakfast channel), Tom Holland. Good weblog posts too.
Also on the Toldinstone channel:
* https://fao-on.org/wp-content/uploads/2024/08/Nuclear-Refurb...
Until a few years ago it was cheaper than methane/natural gas:
* https://www.oeb.ca/sites/default/files/rpp-price-report-2023...
At least when it comes to refurbishment, the independent (reports to provincial parliament) FAO found:
> Overall, despite near-term Nuclear Price increases, the Plan is projected to provide ratepayers with a long-term supply of relatively low-cost, low emissions electricity.
* https://fao-on.org/wp-content/uploads/2024/08/Nuclear-Refurb...
Their projections go to 2064.
New-nuclear is worthy of discussion, but given we have stood up supply chains via the refurbishment process, there's a lot of knowledge out there. My current largest complaint with the new-nuclear plans is the SMRs.
It was broken up into "constituent" components in 1998, and the a lot of the nuclear plant construction financing debt didn't fit neatly into any one of them, so a separate legal entity was created: Ontario Electricity Financial Corporation (OEFC).
Ratepayers pay their electrical bills, the money goes to local utilities and entities like OPG and Hydro One, which in turn pay OEFC.
The claim that it was bankrupt was a line used by Mike Harris et co to justify privatization.
Ontario Hydro did not go bankrupt.
It was broken up into "constituent" components in 1998, and the a lot of the nuclear plant construction financing debt didn't fit neatly into any one of them, so a separate legal entity was created: Ontario Electricity Financial Corporation (OEFC).
Ratepayers pay their electrical bills, the money goes to local utilities and entities like OPG and Hydro One, which in turn pay OEFC.
The claim that it was bankrupt was a line used by Mike Harris et co to justify privatization.
It's similar to the housing crisis: all this talk about pre-built components to make building homes/mid-rises/etc faster ignores all the planning approval and NIMBY objections that need to be ploughed through first.
One risk is your focus going from what's on the road to what's coming into your ears.
This may have some useful mental aspects if you're doing a long-distance drudgery ride down Route 66 with nothing much happening in between pitstops, but it's another thing on I-5 or I-95 with all sorts of chaotic lane changes going on.
No.
For example, every beginner-advice thread in /r/motorcycle has a highly-upvoted comment(s) recommending ear protection, including many folks stating they wish they had started using it earlier.
And even if it is conceded that sound may not save you from other vehicles, ear pro(tection) reduces the health risk of hearing loss that would effect other aspects of your life.
What kind of NRR rating, active or passive, do they have?
I wear disposable foam plugs when riding, and haven't ever considered using the AirPods I have. I find the sound of the machine part of the experience of riding and wouldn't really want to get rid of it; I treat the moto sound as a kind of white noise that's different that everything else in my life (though this is with a short-ish commute, and not long-distance drudgery).
If I wanted music or comms I would probably lean more towards ear plugs plus a Cardo/Sena unit. Or perhaps something with an official ANSI/CSA NRR rating, like Isotunes.
The design life spans of bridges are 50-75, with some going towards 75-150. But once a bridge is EOL, the need for it doesn't just go away: it needs to be replaced. And in the intervening years it needs to be maintained.
So we have finite-but-overlapping life spans of infrastructure with the implicit assumption that society/civilization will continue on existing to deal with repair, renewal, and updating said infrastructure. Used-fuel storage is no different.
And if you want to reduce the total volume, spend money on reprocessing (which is currently more expensive than digging new fuel out of the ground; only France makes an effort to do this).
Do not under-estimate the number of thieves on the left-hand side of the bell curve: if you can deal with those that's half the population that's less of a problem.
(The thieves on the right-hand side of the bell curve generally work on Wall Street and generally don't do break-and-enters.)
> * The FAO estimates that the Plan will result in nuclear generation supplying a significant proportion of Ontario electricity demand from 2016 to 2064 at an average price of $80.7/MWh in 2017 dollars. (For reference, the 2017 Nuclear Price is $69/MWh and the current price of electricity for most residential and small business ratepayers is $114.9/MWh.)
> * The Nuclear Price will be higher than the average price of $80.7/MWh during the majority of the time that the reactors are being refurbished from 2016 to 2033. Post refurbishment, ratepayers will benefit from a lower than average Nuclear Price.
> * Overall, despite near-term Nuclear Price increases, the Plan is projected to provide ratepayers with a long-term supply of relatively low-cost, low emissions electricity.
> * OPG will realize a financial return from the operation of the DNGS and PNGS. OPG is owned by the Province and any return would improve the Province’s fiscal position. There is no significant fiscal impact to the Province from the refurbishment of reactors at the BNGS as it is operated by Bruce Power, a private sector organization.
* https://fao-on.org/wp-content/uploads/2024/08/Nuclear-Refurb...
I was not able to find a similar report (pro or con) for new build, though I think the current plan with some SMRs in Ontario is dumb: if we decide on more nuclear, we should stick with big(ger) CANDU, as there's little point in small reactors in a large grid like Ontario.
Renewable programs have also cost Ontario ratepayers quite a bit of money, for not a lot of electricity generated:
* https://ospe.on.ca/advocacy/green-energy-contracts-fao-repor...
Japan was able to start construction on a new nuclear reactor and have its construction (and start commercial service) with-in five years, and did so every year from the mid-1980s to the early-2000s:
* https://en.wikipedia.org/wiki/List_of_commercial_nuclear_rea...
The first unit you build will be expensive, the second less so, the third even less. Economies of scale work just as well for nuclear plants as they do for widgets: Vogtle Unit 3 was expensive AF, Unit 4 cost 30% less.
Turns out if you don't know what you're doing, things can get be expensive because you're learning lessons along the way, but if/once you do know what you're doing costs drop.
Ontario's Bruce A site (Units 1-4) have an age of ~45 years, and has just finished refurbishment (ahead of schedule and under budget) to run for another few decades:
* https://www.ctvnews.ca/london/article/refurbishment-of-bruce...
Ontario's Pickering B nuclear site (Units 5-8) have an age of ~40 years, and are about to be refurbished to run another 30+ years:
* https://archive.is/https://www.thestar.com/politics/provinci...
So while the 60-80 years has not been hit, it is probably less on the "speculative" side of spectrum and more on the "probable" side.
In Ontario, Canada, 50% of all power comes from nuclear and costs CAD 0.12/kWh (USD 0.08/kWh); see Table 2:
* https://www.oeb.ca/sites/default/files/rpp-price-report-2025...
On the spectrum from "cheap" to expensive, where would that fall?
For many years it was actually cheaper than (methane/natural) gas:
* https://www.oeb.ca/sites/default/files/rpp-price-report-2023...
As someone who lives in Ontario, Canada, where 50% of all electricity currently comes from nuclear power:
* https://www.ieso.ca/power-data?type=supply
I have no problem with getting more CANDU reactors (which is the current plan).
It's not a 10k year problem, it's a ~300 year problem, after which most of it is at the same level as natural uranium ore; and the stuff that isn't can be blocked via aluminium foil (to stop beta particles).
The first 10-20 years post-removal are the most dangerous, and why the fuel is kept in cooling ponds. From 10-300 you still have danger, but that is manageable with concrete casts:
* https://xcancel.com/MadiHilly/status/1671491294831493120
* https://xcancel.com/ParisOrtizWines/status/11951849706139361...
Once you're past the ~300 year mark, all the most dangerous isotopes have burned away, and you're at point where the main ways of getting ill from what remains is by either eating the pellets or grinding them up and snorting the powder like cocaine.
Yes? Just have them sit in concrete casks? It's safe enough to do a 'maternity photoshoot' with:
* https://xcancel.com/MadiHilly/status/1671491294831493120
The volumes of "waste" that is generated, given the electricity produced, is not a lot. The entirety of the US' waste created, over the course of multiple decades, can fit on single football field/pitch, ten yards/metres high (that's the actual fuel bundles: the dry casks they're stored in would increase the volume).
France is just across the border, so Orano can do reprocessing with the "waste" to reduce its volume even further if desired, and extract the unused fuel from the waste.
* https://www.theregister.com/off-prem/2010/09/09/oracle-and-n...
* https://www.computerworld.com/article/1585889/opinion-patent...
NetApp originally sued then-independent Sun in 2007, and Sun counter-sued.
Free/TrueNAS/iXsystems has been offering ZFS-based solutions for many years now, and I haven't heard NetApp going after them:
> Five guys moving a server to a new datacenter without shutting it down. Without cutting it off from the internet. And as using a car would have been too easy, they used public transport.
* https://www.youtube.com/watch?v=vQ5MA685ApE (DE audio, EN subs)
See also perhaps:
> The HotPlug allows hot seizure and removal of computers from the field to anywhere else. The HotPlug's patented technology keeps power flowing to the computer while transferring the computer's power input from one A/C source (such as a wall outlet or power strip) to another (a portable UPS) and back again.
* https://shop.digistor.com/products/hotplug-field-kit
* 2007 potato-quality demo: https://www.youtube.com/watch?v=erq4TO_a3z8&
He was never in a policy position (perhaps one year under Feldstein in Reagan's CEA?).
In a 2011 paper examining talking head / pundit prediction accuracies, Krugman came out on as most accurate:
* https://www.hamilton.edu/documents/an-analysis-of-the-accura...
He actually revisited the 1998 article in a 2023 NYT column:
* https://www.nytimes.com/2023/04/04/opinion/internet-economy....
The productivity numbers show he wasn't as wrong, economically, as folks try to make him out to be, which point (4) goes into. The research on computers and productivity goes back decades:
* https://en.wikipedia.org/wiki/Productivity_paradox
* https://www.brookings.edu/articles/the-solow-productivity-pa...