Part of the point of these projects in particular is to get the machine spinning. Once it's running you start getting some of the economies of scale
1,776 karma · joined June 2, 2020
Part of the point of these projects in particular is to get the machine spinning. Once it's running you start getting some of the economies of scale
Which, honestly, is fine. A lot of juice to squeeze in efficiency and even if models got zero more capable, making the capability that is already here cheaper is a huge win for everyone (except Nvidia)
Reducing the number of transformers, raising the high side of system voltage, and increasing conductor sizes are all ways to reduce the transmission losses. of course each of those requires investments so that's why it can be variable and also something to brag about
There's usually an incentive to solve this though because this shrinkage, in retail terms, would be handled at the cost of power generated (without any profit margin) whereas if it was sold to a paying customer it'd have a margin built in. If the Greek utilities are allowed to make a profit on that losses line item, that is insane
People expecting that the content companies were going to just accept lower revenue forever and not eventually get back to cable pricing were fooling themselves
In fact, the content companies are planning on making more money than they did under cable because since they're selling direct to the consumer, there's no DirecTV/Comcast/Charter middleman taking a slice anymore
Of course they'll sell through those intermediaries and take a cut but it will be much less than the cable companies were getting before, and will just go into the marketing cost bucket
Source of truth from this one is I've worked in public higher ed in two states in the US and gone through this process personally
Yes. I recently got a job (IT infrastructure engineer with a non-tech company) on a posting that was 6 months old. they had filled it, and at the same time got approval for a second headcount so they never pulled it down
Probably has something to do with that. Why on Earth are there 27 different transit agencies in the Bay Area? Probably should be a single digit, no?
The best estimates I could find have TS at a 1-2% market share. And that was my point: You suggested "well if Tailscale can get away with not supporting SAML, anyone can!" and I think that's wrong. 98% of the market already is buying Tailscale's competitors, they can hardly do worse
I'm sure they can juice that a good deal more, but eventually they'll have to start picking off features that they have been avoiding to this point. Will that be SAML? Maybe not, most companies are on Entra ID which supports OIDC. The real tell will be when Tailscale either goes public or sells to private equity. When their backs are to the wall and they need to squeeze out another percent or two in growth and they have a big customer that must have SAML, then they'll do it
I think you're drastically overstating Tailscale's share and ubiquity in the market. Maybe it's heavily represented in tech companies or those in The Valley but among rank and file normal companies not dominated by developers, they've never heard of Tailscale
I'm guessing it's one of those completely over-engineered bits about IPv6 that is that way just because they wanted to engineer in so much complexity almost for the sake of it
You would put the check before it actually does the thing. It's at the "end" of the process of figuring out what it wants to do, not the end of fulfilling the request or prompt