What is the overnight construction cost for China and Russia??
We have at least 6 magic wands: 1) if the VVER 1200 truly cost 1.4 billion to construct in 4 years, nuclear economics are saved. 2) building a lot of marine nuclear plants https://whatisnuclear.com/economics.html#economies-of-scale-... They require far less concrete (no need to protect against seisms) and much less redundancy because the cooler (water) will always be there (the ocean won't disappear) hence preventing radiations escalation in a passive way. 3) using disruptively simpler/cheaper models https://www.iaea.org/sites/default/files/publications/magazi... 4) using more complex but significantly more efficient models (I'm mainly talking about the underresearched supracritical reactors) 5) if SMRs are not a scam and can really have a fordism era 6) rationalizing et reconciloating regulations with cost effectiveness.
Well it looks like you have been asking in the wrong places: https://whatisnuclear.com/economics.html#public-concern-grow...
It's crazy what people come to believe. To generalize the pathetic bureaucratic failures like the EPR to all model couldn't be farther from reality.
Russian commercialized VVER 1200 models take 57 month to build. Their successor, the VVER-TOI take 40 month, so 3.5 year to build. It output 1300MWe Besides the russian competitive advantage, China build plants in 6 years.
requiring about 35% fewer operational personnel than the VVER-1000
This was for VVER 1200 however the new VVER TOI will be the first to use software? > United information space is a multi-platform software and hardware complex intended for control of the engineering data for engineering, designing, as well as arranging communication between territorially-distanced project participants.
edit: can someone help me calculate the construction costs of a VVER 1200 ? it output ~1200MWe of energy Specifications include a $1,200 per kW overnight construction cost if 1 MWe is 1000Kwh (don't know if we're talking per hour..) then total construction cost would be 1200 * 1000 == 1200000 dollars 1200000 is a mere million, that doesn't make any sense, how to calculate? https://en.wikipedia.org/wiki/VVER#:~:text=Specifications%20... edit I was dumb the equation is 1200 * 1000 * 1200 == 1440000000. Therefore, if that is to be believed, a VVER 1200 produce 1200MWe and only cost 1.4 billion in construction costs (without the small interest rate and the operating cost) That is extremely cheap, the pathetic and hyped small reactors from rolls royce cost 1 Billion per unit and produce < 200 MWe... That makes the VVER 1200 6 times cheaper and probably the cheapest energy source on earth (again assuming those numbers are true), and the VVER TOI successor should be even cheaper given it is constructed in 17 months less.
[0] https://en.wikipedia.org/wiki/VVER#VVER-TOI If anyone has more info on those seemingly disruptive VVER-TOI, please share