Go the Fuck Home: Engineering Work/Life Balance
youtube.com
youtube.com
I find the "go the fuck home" strategy works for projects where output can be correlated with time spent. I'm in a situation where we're in new terrain, we're hitting problems that haven't been encountered before in our space. To fix them properly, I need to do a deep dive and fix the root cause, this takes time, time which seems to never exist.
Its quite insulting when someone says, "You can't get done this between 9-5, so you're incapable of doing this job."
Have you guys been in this type of a grind? I'm not sure how to deal with this right now other than fixing the core issues and moving on, which basically means working even more.
I'm thinking about trying to implement a "quiet time," an hour or a few hour window everyday where you can expect some radio-silence. Even if it's once or twice a week I think it'd help.
I really wish I stashed this article I read a year or so ago. I've tried to find it a few times and haven't. It was a college professor talking about how normal work hours are filled with procedure; boring stuff necessary for the job. Time cards, meetings, etc. This really encroaches on productive time. Most of us chose our line of work because it's something that interests us.
In that same vein, there are things your management finds worth spending time on and things you feel are more important. Your normal work hours are beholden to your supervisor since they pay the bills. After hours, you can choose what to work on. Glaring problems will be around for years and only get addressed if someone takes the time to address time. They're never "significant" enough to get scheduled.
I don't think the answer is to work extra hours unpaid. But I don't think talks like this address the reason people do it.
So far my manager was on my side because I wasn't informed about these tasks beforehand, but this still causes a lot of stress for me.