The levelized cost of electricity (LCOE) is estimated to be far greater for PV and wind. Why? The operation and management (O&M) for PV and Wind is insanely high. Grid scale PV has to be continuously cleaned with deionized water because dust and greenery can dramatically decrease efficiency. If a leaf lands on a cell, energy builds up like a capacitor in the shadowed area, and it can eventually decimate the whole cell.
On wind: the intermittency is overwhelming, and the cost to deal with that at base load is estimated in the trillions without even adding an extra megawatt to the grid.
In an urbanized setting, plants must be able to concentrate energy using small land mass. Neither wind or PV can do this at scale.
Some panel data on LCOE in this paper: