Maglev Train Seen Making Washington-to-Baltimore Trip at 311 MPH
bloomberg.com
bloomberg.com
Definition 3d here: http://www.merriam-webster.com/dictionary/see
But hey, if it's confusing to enough people I suppose it's a bad headline.
See what I did there?
>'A maglev train may help ease traffic that has made roads in Maryland’s Montgomery County, which lies between Washington and Baltimore, the fourth-most-congested in the country, according to digital-mapping company TomTom NV. (TOM2) Washington ranks seventh.'
Not really.
Prince Georges, Anne Arundel and Howard lie between Baltimore and DC, hence the existing MARC lines running through them [1]. Any new lines would undoubtedly follow those paths.
It's not DC <-> Baltimore that's miserable it's Northern VA <-> North / East DC suburbs. Transit in the DC area is built around bringing people in and out of DC, not from suburb to suburb.
People who don't take MARC for the DC <-> Baltimore now aren't doing it for time, they're doing it because they don't want to ride the MARC, deal with the bottleneck of Union Station then ride two Metro trains and a bus to get to work in VA. Swapping MARC for Maglev won't change that, but it will cost a lot of money.
Improving the existing infrastructure and/or figuring out how to draw more business into DC proper would be a better use of any funds.
1: http://mta.maryland.gov/sites/default/files/MARCsystemmap.JP...
Bullet trains would only make sense over long distances. This won't happen. What we need is more commuter rail capacity, and more lines, so the trains can make fewer, faster stops. We need to move more people more efficiently, not just faster.
There would have to be few stops...even point to point, for this to work though. Think Shinkansen.
We need more lines going to different places, which would allow people to drive shorter distances to get to the stations, decreasing road traffic, and also helping with crowding on the trains themselves.
The Baker Grade outside of Baker (small town with the Greek Resutrant and literally nothing else, you've ate their if you went to death valley). Is one of the stepest grades in the nation, rising ~6,000ft in ~19 miles. Overall the course will drop you as low as 100ft above sea level, and see you rise to 6,400ft. With minor peaks and vallies dropping as low as 500ft, rising back to 4,000ft.
Source: A lot of automakers vet transmission designs on that highway.
Run this over a 400 mile journey, and yes I'd say it was worth it.
And yes, I'm sure the maglev would be more convenient and nicer and otherwise objectively Better in a variety of ways, but the capital expenditures needed to make these incremental gains happen is huge.
> If the train is only running once every half an hour or once an hour, people will end up waiting around for a train for longer than sitting in it.
No, people don't generally treat commuter trains the same way that they treat subway services and the like. They try to show up for a specific train at a specific time.
If they come in on a connecting service, they sometimes don't have a choice.
Agreed about the airplane, although airport-related overhead is usually quite a bit more than train station-related overhead.
$10B seems exhorbitant for a 40 mile stretch of track + trains etc.
Perhaps, but it's right on par with the cost of the recent Metro extension which cost $6.8B for an 11.6 mile extension running on existing tech.
Successfully building an entirely new Maglev line for 'only' $10B would be a steal relatively speaking, but I don't see that happening.
More likely, I'd expect the planners want Government buy-in because they recognize how susceptible the Government is to chasing sunk costs and covering all the difference when the project predictably balloons to 5x what was proposed.
1: http://en.wikipedia.org/wiki/Silver_Line_(Washington_Metro)
Given that the Silver Line is proving extremely useful by finally hooking up Tysons Corner, a major city center, to the DC metro system, and given the general uselessness of shaving a few minutes off the existing Baltimore-DC routes, I'd hardly call $10 billion for a maglev line a "steal".
You're right, I did mistate the length.
In general though, I think you're misunderstanding my thrust here. You're talking about value, I don't think this project is a good value at all, quite the opposite [1].
I'm just thinking about engineering and construction...
The Silver Line is a demonstration that building 23 miles of 45 mph commuter rail line costs at least $6.8B despite the benefit the benefit of 40 years, 100+ miles and 90 stations worth of experience doing the same.
Given that, actually building a first of it's kind 40 mile 300 mph rail line through the same sort of aerial and tunnel requiring [2] suburban counties around DC for 'only' $10B seems completely implausible.
1: https://news.ycombinator.com/item?id=8492525
2: http://www.baltimoresun.com/news/maryland/bal-maglev-train-i...
[1] http://usatoday30.usatoday.com/news/nation/2006-07-15-u.s.-h... [2] http://www.examiner.com/article/texans-call-for-boycott-of-f...
No...this wouldn't do anything for Montgomery County, which is mostly northwest of DC and not at all on the way to/from Baltimore. Driving to DC from Baltimore you pass through Prince George's County. Unless maybe they expect people are going to move from Montgomery County to Baltimore? That seems unlikely. The type of person who wants to live in Montgomery County does not want to live in Baltimore.
Per the person there they seem to have some plans to deploy in Israel in next 1-1.5 year. Washington to Baltimore using something like this could make a lot more sense, and is much cheaper.
What is interesting is that almost no one seems to have heard of them when they seem to have some real technology. Elon's hyperloop theoritical proposal got more publicity.
LOL. Thanks for the comedy this morning. I'm guessing they're looking for somewhere around $5B (half of the proposed cost). As nice as it would be to see something like this, the US government has no designs on dropping a fraction of that money on any kind of rail system. They can't even pay for the current road infrastructure.
[1] The exceptions: https://en.wikipedia.org/wiki/Amtrak#Tracks_owned_or_leased_...
[1] to the tune of $1.4B last year http://en.wikipedia.org/wiki/Amtrak#Public_funding
You do understand that Amtrak is profitable in the Northeast?
http://www.washingtonpost.com/blogs/wonkblog/wp/2013/03/01/a...
Considering the track record they have big projects in that area, namely Boston's Big Dig, and how much money alone gets blown on light rail where estimates are wholly inadequate, this seems like political grandstanding or distraction.
Concentrate on creating jobs for those who need them, this is not something HSR will do.