What it took for SpaceX to become a serious space company
theatlantic.com
theatlantic.com
> I have to share with you, as a sort of sideline, do you know where our Other Transaction Authority comes from? The guy who wrote the [National Aeronautics and] Space Act, who was just incredible, was a very young guy. This was back in 1957, ’58. [Paul G.] Dembling. I had the opportunity a couple of times to talk to him, and he told a story which I’m sure is true. He was a young attorney and he’d only been practicing for a few years. The Russians had launched Sputnik [in 1957], and there was panic in America. We did have a military space agency, but President [Dwight D.] Eisenhower said, “I need a civil space agency.”
> Mr. Dembling was tasked with writing the Space Act, and he sat down and did a lot of research and he wrote it. He told me, “I did the best job I could. I read everything, but I knew in the final analysis there might have been something I missed. So I sat down and I said, ‘Well, how can I cover that?’ I can cover that by saying, ‘And NASA can do any other agreement, arrangement, whatever it needs to do to fulfill its mission.’” That became the Other Transaction Authority. You know how Sherwin-Williams [Company] paint covers the world? He basically said, “If I’ve forgotten something, use this.”
> … He said, “I sat there, and I thought I probably missed something. Now, what can I put in that will let them do whatever they need to do?” Back then, in ’58, the whole nation was roiled. It was still the Cold War, the Russians had a Sputnik, we could hear it, beep-beep-beeping. Those who were alive at that time can remember being taught to get under our little school desks and hunker down, like that was going to protect you from an atomic weapon. In any event, that was the climate of fear in the country, so getting a civil space agency stood up and running was very important. Paul came up with the Other Transaction Authority stuff. Who knew, right? Who knew?
http://www.jsc.nasa.gov/history/oral_histories/C3PO/WholleyM...
[0] http://daindunston.com/wp-content/uploads/cover-the-earth.jp...
>Boeing, will do the same job but at more than half again the cost—some $4.2 billion.
Leaving aside how horribly this is worded, what does this even mean? Two lines later it said Boeing was awarded a contract nearly twice as large.
I think it represents the varying levels of perceived risk in delivery, and a tacit acknowledgement that SpaceX is simply operating (at least) 2x as efficiently. If SpaceX fully delivers on their contract, I hope we see Boeing squeezed harder next time. What would be even more interesting is if SpaceX were to hit the finish line on time and budget, and Boeing getting lost in billions of cost overruns and delays. The article talks about "cost+" accounting, so that may play a part in how this happened as well.
In the end I like that they awarded two contracts. There really is nothing like good competition to motivate everyone.
The contract SpaceX received was bigger than any contract SpaceX had previously received. The contract Boeing received was larger than SpaceX's, but not Boeing's largest in its history by far.
>Last month, NASA said it would pay SpaceX its largest single contract ever, $2.6 billion
The word "its" is an ambiguous pronoun - those who read it to mean "NASA" are left confused, since it seems like NASA just went around awarding even larger contracts. In fact, I think it's not only ambiguous, but in the most obvious interpretation of that sentence, it does indeed sound like NASA's biggest single awarded contract ever.
What will be a real blow for Boeing is if they actually have to execute options on the "+" side of that -- if SpaceX hits their cost target and Boeing costs not only double, but triple, good luck wining the next contract as a prime.
Usually there are additional award fees for getting stuff done on time.
In 2008, SpaceX did only 4 launches, of which only 1 successful, of much smaller light Falcon 1 vehicle, Orbital built 2 distinct successful launch vehicles - Taurus and Pegasus - and apart from that, it built complex satellites, being a company with 25+ years of experience and much more funding and track record. Should 2008 CRS contract be awarded today, it would be probably much different because now SpaceX appears more qualified.
Same applies to Boeing today - for all achievements of SpaceX, Boeing is a nearly 100 year old company which was in space business since before the space age, and about two orders of magnitude larger - for them, CST-100 is a simple device not presenting much technical risk.
Since the CST-100 is only used for people, it will have a much lower flight rate and much less testing before humans fly in it.
Finally, Manned Dragon will have its abort test flown within the next few months; CST-100 is a bit behind.
See http://en.wikipedia.org/wiki/Commercial_Crew_Development#Com...
2.6 + 2.6 / 2 =
2.6 * 1.5 =
2.6 + 1.3 =
3.9 < 4.2
“Half again” something means 1.5 times something.the "its" here refers SpaceX, so largest contract of SpaceX, not largest contract of NASA.
could be considered a vague pronoun reference: http://www.towson.edu/ows/modulepro.htm
> NASA said it would pay SpaceX SpaceX's largest single contract ever, $2.6 billion
(I'm a big SpaceX fan, I am just even more a fan of accurate reporting.)
[1] http://www.forbes.com/sites/alexknapp/2014/09/16/reports-boe...
[2] http://www.forbes.com/sites/alexknapp/2014/09/16/nasa-awards...
On a similar note:
Falcon, Merlin, Kestrel, and Dragon: Not the Victorian virtues—Enterprise, Endeavor, Discovery—honored by the space shuttles they replace, nor competitor NASA’s classical Atlas, Orion, Apollo, and Saturn. SpaceX’s machines were made by people who read pulp fantasy novels as children, or the paperback science fiction of Musk’s childhood in Pretoria, South Africa
will do the same job but at more than half again the cost—some $4.2 billion.
This isn't English. Who writes like this?
Because editors.
Flight 2: http://youtu.be/YMvQsmLv44o
Flight 3: http://youtu.be/Qz0yJ8N3cA0