That's the most interesting part of the article for me.
That's the most interesting part of the article for me.
The pressures required to keep the face stable are a function of the soil properties, lithology, and groundwater. The typical way for someone to access the face is to pressurize ahead of the machine head with gas and have workers enter under pressure (known as a dive or an intervention). Workers generally are limited in how long they can be under pressure and must go through decompression.
Edit: real quick calculation on my phone puts them at about 70 psi or 4.5 atm of pressure to do a manned intervention, possibly higher for safety
Disclosure: underground tunneling is my profession.
I'm not really qualified to answer your question as I'm not as intimate with the machines as I am with the ground/structure side. Most likely the seal is maintained by the machine being too big for the hole being cut or by inflatable packers. The walls of the bore can range from extremely smooth to not smooth at all depending on ground conditions.
Sorry.
It's a little hard to picture so jump to 5m on this video. http://www.youtube.com/watch?v=Dk-8Q42NCSQ
And an animation of the machine that is being used in Seattle: http://www.youtube.com/watch?v=Dk-8Q42NCSQ
These things are only true for slurry-face TBM's. There are other sorts of TBM's out there, but the Seattle one is a SFTBM.
That is the best thing I've read all week :) That's an awesome job! How common is that? Do you get hired for individual contracts, or are there entire companies that tunnelling is what they do 24/7?
Top of the boring machine is 60 ft from the surface, but it's 60 ft high so bottom of it is 120 ft. That's 120/33 = 3.6 atmospheres in the ocean, and my reading of the article above is that it may even be higher here due to groundwater pressure. Anyway, you need decompression at anything over 1 atmosphere given enough time as I recall?
Edit: fascinating machine. So yes, it maintains pressure in front of the drill head to resist ground and water pressure.
http://www.hitachizosen.co.jp/english/pickup/pickup008.html
http://www.ncus.ntu.edu.sg/Events/Documents/SRMEG%20Seminar%...
The unfinished tunnel might be filled with water if it wasn't for the pressure that the TBM maintains at the cutting face.
They probably have an airlock behind the machine since I doubt the drill head itself is air tight against the walls.
Any bore holes would have to be water proof, or at least pressurized to keep them from filling up.