Most of the comments so far seem to focus on KS projects. Of course, there are issues well outside of KS campaigns. Software is easy. You have full control of just about everything you need to assemble your product. Hardware is a different beast.
There are issues in the design and manufacturing of physical products that border on being surreal --until you understand the reasons behind some of them. The first time a distributor told me "delivery for those parts is 22 weeks" I could not comprehend how they could stay in business. As I gained experience I realized they did that precisely because they are trying to stay in business (among other factors).
Also, while true to a great extent, going with authorized distributors isn't necessarily a guarantee of getting good parts. I have a couple of wire racks with enough defective components to buy two brand-new entry-level BMW's to back that up. Sometimes authorized distributors can get, shall we say, creative. Under special circumstances they'll work with brokers to bring in parts to fill orders that might be in allocation. They'll have you agree to NCNR terms and then, if there are issues with the parts you are on your own. If you don't know what "allocation" and "NCNR" mean and you are in a hardware startup...GOTO paragraph 1.
One of the interesting side-effects of our current plug-together "engineering" environment is that kids are coming out of school with very little real hardware experience. Snapping together a bunch of Arduino compatible hardware isn't equivalent to designing and making said hardware. I read lots of complaints on HN about software engineering applicants not being able to code. I've seen the same kind of thing with EE's not being able to design their way out of a paper bag. Pretty sad state of affairs.
In the case of small orders, manufacturers may wait to start a production run until enough orders have come in to make it worth it, which can mean long lead times for someone who only wants 100 of something
First, please understand that chip manufacturers don't exist to sell hobbyists or startups a few dozen to a few hundred chips per year. They need to sell anywhere from tens of thousands to hundreds of thousands of components per month. That's their reality. The bulk of their existence is devoted to producing lines of components that are, to varying degrees, pre-sold under contract and allocated to specific products and manufacturers.
Each component category has different dynamics. What's true for common grade ceramic capacitors and resistors might not be true for the high-grade capacitors needed in power distribution systems for high speed boards. The realities for pushbutton switches are different than what happens in the manufacture of integrated circuits, sensors or connectors.
Except for real commodity items that everyone uses (SMD 0402 5% resistors) lots of components are simply not manufactured outside of solid contractual arrangements with OEMs. This is necessary in order to plan volume manufacturing and, therefore, reduce costs.
For example, it isn't rare to have a component manufacturer ask an OEM for a product plan and projected volumes before even agreeing to sell them a part. The processor in the RaspberryPi falls under this category. There are a number of chips in consumer products that are not available for general low volume purchasing. You can't even get a data sheet unless you can show that you are going to consume the chips in volume.
The point is that the component business, be it switches or IC's is all about volume.
How do small volume users get parts then?
I am going to over-simplify this and simply say that we get to buy what's left over after fully allocated production runs. If you want to buy a component that is being driven with demand by, say, Apple, you can --and will-- run into "allocation" events. These are points in time when the chip manufacturer is contractually obligated to deliver x number of chips to Apple. If there's nothing left for non-contractual customers to feed on they simply have to wait until the next production batch.
Distributors go out and sell these chips. They book orders and feed the numbers to the chip manufacturer. Most of these orders require that you agree to "NCNR" terms. "NCNR" means non-cancelable and non-refundable. In other words: You own what you ordered and there is no way out of the deal. They do this because the chip manufacturer will aggregate all of these orders and tack on that number to the batch they are running for their contractual customers.
The accumulation timeline is variable and often depends on market conditions. During the economic downturn (roughly 2008 to 2010) thousands of parts went on allocation. Lead times got out to 20, 30 even 40 weeks. Yes, if you picked the wrong part you had the very real possibility of having to wait almost a year to get in on a manufacturing run. Why? Because nobody was buying anything and they couldn't aggregate enough orders to justify making a run.
The other --and far more complex-- aspect of this is the need to equalize manufacturing volume. In order to support their infrastructure component manufacturers would rather have a steady and reasonably uniform level of orders per unit time (say, per month or quarter) than crazy unpredictable spikes. This means that they might very well force allocation or control events on the supply in order to group orders and schedule them as necessary. It makes no sense to, for example, increase costs significantly during a month when an abnormal spike in volume occurs when you can often simply tell the OEM that their parts will come out of the next run in four to ten weeks.
Distributors will only stock components they know they can turn over quickly. Inventory turns per quarter or year is THE king metric in any business that holds anything in a warehouse. If distributors stocked rarely used components in order to be able to provide you with short lead times they'd lose tons of money and possibly cause enough self-mutilation to go out of business. And so, in the context of an entire ecosystem that has to remain healthy through variable market conditions there is no choice but to have delivery lead times that are "impedance matched" to what's going on with the entire pipeline and not the needs of a lonely small to mid-sized OEM that isn't really floating the boat.
We've also run into the "Sorry, we can't sell you those parts" a few times, so it's a for real thing.
Actually, someone who carefully studies Bunnie Huang's blog will end up with a better knowledge of these matters than many practicing EEs have.
Frankly, there's not really that much to know, other than "Don't pay full retail" and "Don't believe any promises that don't come with a FedEx tracking number and/or a report from your own incoming test facility." The rest of the details simply expand on those two admonitions.
I'm interested in what leads you to believe that.
> other than "Don't pay full retail"
I don't understand what this means in the context of business to business deals. Also, sometimes component suppliers have you over a barrel, and they know it. You'll end up paying way more than whatever retail used to be because you need that component.
Experience shipping hardware. Not much happened to me that Bunnie didn't warn me about, directly or indirectly. (I've followed his blog for a long time.)
I don't understand what this means in the context of business to business deals.
"Full retail" meaning "buy production inventory from DigiKey." The manufacturers' reps are usually able to cut you a much better deal than DigiMouse(tm).
Sure. A couple of blog posts and everyone is an expert.
Physical products encompass a very wide range of disciplines. You would be monumentally wrong to think that component purchasing is the most difficult aspect of bringing physical products to market successfully.
It's almost like saying that money is the only variable in building good websites, or the choice of a language or framework. The fact is that software development is a very complex art, often requiring expertise in a wide range of disciplines.
Yes, I know, in my prior post I said "software is easy" and now I am saying the exact opposite. I meant it in relative terms. An individual or a team with the right skill set can hack away and create a world-class software product with free tools, in their bathrobes, in a dorm room. They can deploy it to thousands of people, modify, fine-tune, fix and even pivot the product with little if any cost. College kids right out of school (or even before) can develop and offer significant software products.
Hardware or physical products are not like that. It is rare to have recent grads or drop-outs have the necessary skills to complete such projects. They require a lot of money and multi-disciplinary expertise. These days this generally means expertise in mechanical, electrical and software engineering as well as manufacturing, supply chain management, quality control, testing and more. Depending on what you are doing each of those disciplines often require domain expertise in sub-specialties. For example, electrical engineering ranges from analog and digital design to signal and power integrity --crucial for high-speed designs.
In addition to that, hardware products require expensive specialized tools and often years of expertise using them. Laying out a 12 layer circuit board for an FPGA board with signals ranging into the GHz range isn't something one is going to do with a free PCB layout tool and a handful of online tutorials. The machine I am typing this on has somewhere close to $50,000 in software tools installed --EDA, CAD, CAM, FEA, Field Solvers, Compilers, etc. The cost of the PC itself is a rounding error when compared to the cost of the software, the annual licensing and support agreements as well as the training costs.
Outside of that, depending on what you are doing, you might need tens to hundreds of thousands of dollars in standard and specialized test equipment and tools.
Let's put it this way. YC funds startups to the tune of $15K to $20K to develop the first incarnation of a software product. Just one of our DSO's (Digital Storage Oscilloscope) costs nearly twice that much. The point isn't to boast --we are small potatoes-- but rather to try to impress upon you that the hardware game is very, very different than doing software and the variables involved go far beyond how and where you buy your components or whether your Excel spreadsheet with your BOM is formatted correctly.
I could go on. The point is that in relative terms software products are easy. And that's what I meant.
I once worked for a VP of Engineering who was a hardware guy. I was a hardware guy, things were totally copacetic.
Unfortunately the software guys in that company weren't happy campers, because they were the lowest in the pecking order. The VP was sure that software was "easy", even though he didn't know much about it.
Still, things could be worse. Try working at a company run by marketing (I also did that once upon a time). Then both the hardware and the software guys are sucking hind tit.
What do you guys think of having the component manufacturer source the parts? I've seen some that purchase parts directly from Digikey, but I'm not sure if they pool together orders for discounts, or if they just handle the purchasing so you don't have to. It seems like they could get a better deal than I could (I always assumed that a manufacturer would try to source locally in China and get stuff for dirt cheap, but they buy from Digikey too - seems kind of strange).
Does anyone know any good US based contract manufacturers? All the ones I've seen are ridiculously expensive ($17 for a 4" x 1" board with ~60 components, as opposed to ~$6 at Myro (thanks theunixbeard for catching that error)). I'd love to get something made here in the US, but I can't eat another $10 for my lights - especially for a service like assembly (where the quality seems like it won't matter that much - the light will work or it won't work). I've been toying with the idea of a stretch goal on Kickstarter to assemble some delta bots to do the electronic assembly (it'd be about $1200 for a single bot, whereas contract manufacturing is about $2000, but I'd have something to show for that money with a pick and place machine). Having a machine where you could throw a stenciled PCB on in any orientation, then pick and place the parts onto, and cook it on the spot (moving the camera up and watching for reflow) would be pretty awesome.
It's sticky being in the 'middle' - big enough where you need to use services rather than hand assembly, but small enough where you don't really have any purchasing power. The road to production has a big no man's land in the middle.
Ch00f has a great write up on the process of going through with contract manufacturing, and some of the hurdles he saw with the process - http://ch00ftech.com/2013/04/16/making-55-of-something-witho...
I'm assuming you're asking about having the contract manufacturer source the parts, right? This is typically called "turnkey" contract manufacturing as opposed to "consignment" where you source the parts yourself. It really depends on the kind of product you're building and your ability to negotiate with component distributors an manufacturers. If it's your first time around and you're optimizing for speed, turnkey is probably the way to go. If you need specialty parts and you know how to source them more effectively than your CM, then consignment may make more sense.
It's weird because when we buy off our BOMs from our regular suppliers we'd get well packed components that were easy to goods-in inspect and put to kit. If we needed 250 surface mount resistors we knew we either had a reel, or we would buy a reel because we'd probably use them.
But when the customers supplied stuff it'd come in horrible little bits and bobs. You'd get a strip of exactly 250 SM resistors. (Which is horrible for the P&P machine we were using, and resistors get dropped by the machine a lot). To us it should have been the other way round - "Supply the kit yourself? We charge you 10% (of something) because we still have to goods in inspect it and kit it and etc".
Most manufacturers are happy to do a mix. So, if your product uses one weird IC and you happen to have stock of it, but nothing else, feel free to tell them that you're supplying that part.
Second quote of the week in one week. ;-)
I make a couple of small electronic gadgets for my side business. My day job is also involved in electronic manufacturing, and I've had a good overview of what it involves.
Amusing anecdote: I was restocking a critical part, and noticed that one of the _alternate_ part numbers was on end-of-life status. I panicked and bought out my supplier's entire inventory of my preferred part number.
That turned out to be the world's remaining supply, and the part is now obsolete. I suppose at the end of the day, the lesson is that no matter how good you think your suppliers are about keeping you apprised of component lifetime issues, once in a while, you're going to get screwed.
For being in the "middle," it's not just purchasing power, but that there are a lot of shady vendors out there. Any start-up that is headed towards that wilderness had better have an experienced buyer along. In fact, if you're still working at a day job, any experience you can get in the trenches of supply chain management will probably benefit you.
It's also worth considering what your design chain looks like, because it is intertwined with your supply chain. For instance, if you're shopping your firmware work out, and your microchip goes obsolete, you'll need to have a plan for responding quickly. I've observed that sourcing issues can eat a measurable fraction of your engineering department's time and attention.
At this point, I've stuffed and soldered 1000+ boards.
Or worst. I personally experienced a sourcing issue kill eight months of engineering design work and hundreds of thousands of dollars. It was a simple case of being a small fish in a big pond and the suppliers not giving a shit about providing advance EOL notices. No recourse. You have to redesign your product and hope to survive.
I have experience of Sage line 50 / line 100. They were awful for the bits most of the company needed to do.
I think they're, what, 7? months behind schedule due to hardware issues. I get emails about it, and they're super nice, but 7 months is a long time.
* It's better to over-deliver than over-promise. Yes, your marketing materials were really shiny but the product didn't really live up to expectations
* After-sales support is so bloody important - don't disappear after you've shipped (MiiPC & Cubieboard I'm looking at you)
* Don't lie to me if you say your product is going to be open source or worse, "hacker friendly" (although this was a problem even before Kickstarter and Indiegogo)
* Tailor your communications to your market - the wonderful people over at Ninjablocks/Little Bird Eleectronics had some issues with writing copy that was aimed at general consumers where a lot of their market wanted real technical details
Of course, you'll have different issues to deal with if you're going the VC/startup route rather than the crowdfunding route.
I did a lot of research, talked to some finance guys, and realised I was in well over my head if it was to ever be more than a prototype, so I dropped it. Would've loved to get more info than I could glean from the guys I knew who had supply chain and manufacturing experience: their opinion was "don't do it". Probably a good idea that I listened ;)
The last part is only semi-kidding. Back when I was a project manager (where I DID have some domain experience), that was my rule of thumb and it was more accurate than I like to admit. In another former life in a different role, we had these 95% schedules which were really 95% confidence assuming nothing significant goes wrong schedules--which were about as accurate as you would imagine.
Maybe their experiences will help future YC companies avoid these pain points.
As for finding a good contract manufacturer, there are services like EMSforce that can take a project and present multiple bids to you in a way that offers competitive pricing without sacrificing service.
Sandsquid was born out of our own need, manufacturing USB test jigs for a customer of our consulting business (we then made it as a bunch of scripts, but then decided it's too good to keep for ourselves). We just couldn't come to terms with the amount of effort it takes to order parts for a moderately complicated PCB.
Definitely a good thing for hobbyists/Kickstarterers to keep in mind!