London to Brighton train ride, 1953-2013 [video]
flowingdata.com
flowingdata.com
OTOH the major infrastructure hasn't changed much (bridges, urban areas, not just the train line which is politically determined). Technological change reshapes how live in a lot of ways in short timespans, but it's interesting to reminded that big, capital intestive stuff like bridges and tunnels and roads are still built with 50+ year expected lifetimes. I can't imagine writing software with anything like that staying power.
In 1953 we are still in the age of steam and trees were cut back from the lines to reduce the risk of fires from hot ash.
There was a pretty interesting article with the BBC to accompany this a while back.
I'm assuming that's a joke, but one of the things that's always surprised me is how early electrification happened. The London-Brighton line was electrified in segments from 1909 to 1932. Many of the commuter rail lines in the U.S. were electrified that period too.
The difference that jumped out at me the most is the decline in hats. I wonder how many haberdashers were put out of work during this period.
> it's interesting to reminded that big, capital intestive stuff like bridges and tunnels and roads are still built with 50+ year expected lifetimes. I can't imagine writing software with anything like that staying power.
I've given thought to this. Engineers are expected to get things like that right the first time, and the structures have to last a long time. But the engineers don't have to invent a new kind of bridge or road every time they design one. Software, being cheap to make lots of copies of, has to do something completely new every time you write it.
It wasn't. The first London to Brighton railway line opened in 1841. Most of sections of the two main paths from Brighton to London (to London Victoria and London Bridge respectively) should have been complete by about 1855. There was expansion work (adding extra tracks) on the busiest section of the line around 1908, but I think that was the last major work on the London-Brighton lines apart from connecting branches.
There's of course been replacements and upgrades, but these tends to happen bit by bit.
They'd probably be in the same spot, so it is hard to tell if they have been replaced at the speed the video goes. Also, they would probably re-use legacy supports, bases etc for a new bridge, so they may even look the same as the old ones?
I don't play that much train sims, only a little every now and then but even I recognized parts of the track.
If you have not tried train sims and feel like the idea is a bit daft, I was once with you on that. I had, however, liked watching trains when I was a kid. But after a friend told he liked playing train sims, I had to try too and I enjoyed it. So here's my warm recommendation to try out a train simulator, it's really difficult and fun!
The simulators, particularly MSTS is a pretty good representation and a good challenge. Go try it :) Better than running swearing 12 year olds off the track on Forza.
Machines are shit at noticing these things.
Also the problem is that it's not just about sitting there and pulling a lever - that bit is quite easy. There are a load of surrounding tasks like checking out the locomotives, coupling, shunting, safety rules, signalling, token exchange (which is still used), diagnosing problems (why aren't the brakes releasing can be an hour to diagnose/fix) and the inevitable "managing drunken passengers and coordinating with police" etc.
Not everything is suitable for the lowest common denominator of person or automation.
A 5000-ton freight train capable of barreling along at 100km/h while carrying 50 tanks of propane or anhydrous ammonia or similar is an entirely different risk case ...
The Talgo XXI does 159mph, and the Russian TEP80 did over 168mph in a test run, which is even preserved on video: http://www.youtube.com/watch?v=wwYXjxXFha0 http://www.youtube.com/watch?v=DWDdNe_zx5A
South of East Croydon a substantial stretch is just double track (one in each direction), though most of the line has four tracks (which still makes for a massive chokepoint if a train fails) , and many of the stations have very few platforms and no extra track for trains to pass on. North of East Croydon, there's massive capacity problems on the approach to London Bridge, and on the path from London Bridge in to Charing Cross.
The result is that the slightest little impact to the time table at half a dozen points or more along the line have carry on effects along the entire line.
Increasing the speed of the trains would be great, but without upgrading capacity the slightest little problem would force a lot of following trains to slow down anyway.
EDIT: Apparently the "third rail" is also a problem for increasing speeds.
http://en.m.wikipedia.org/wiki/Bombardier_Voyager_family
They're much more comfortable and quieter than the 125's (43's + mk3s) plus they don't give you a face full of fumes when they start up or scare your children :)
Here's what it sounded like: http://www.youtube.com/watch?v=8H-WKRIXynQ
Apparently the sound of the Valenta engine was used a clip in a song but I've never figured out which one.
The route master gave many people lung cancer who worked at the depots, my father included.
I can actually believe that the journey time hasn't increased since the 1950s. However, possibly the clock at the end of the film is there to indicate the differing journey times?
Anyway, interesting video. thanks for posting.
You can see when they go through the first big tunnel (the merstham tunnel http://en.wikipedia.org/wiki/Merstham_tunnels) they enter at the same time and exit at the same time so the old one must be (maybe??) sped up.
It would have been interesting to see what Gatwick airport was like then but it doesn't really show it, other than there being a big space on the right hand side that isn't there any more (2:11).
1953: no departure time, arrival is 13:05.
1983: departure at 14:00, arrival at 14:03. Fast trip! Or someone cheated setting up clock / departure shots.
2013: departure: 08:32, arrival 09:50.
The Brighton-London trip looks to be about 1:10 based on this site: http://traintimes.org.uk/?page=/service/timetable/lateroutbo...
Trip times here are 58m to 1h 20m. https://www.thetrainline.com/train-times/london-to-brighton
For someone who uses the advanced features of VLC, web video is a frustrating experience.
Which is a long way round of saying "I think it's lens distortion and placement".
Things look mostly the same, and there seems to be more green in the more recent videos.