Japan's maglev train runs test at over 310 mph (with video)
phys.org
phys.org
It's good to see that tech finally get in production (Japan's maglev demonstrators first breached 500km/h in 1979).
FWIW, if all goes well the L0 should be used in the (planned) Chuo-Shinkansen line going straight from Tokyo to Osaka through Nagoya in 67mn: http://en.wikipedia.org/wiki/Chuo_Shinkansen (the fastest runs on the Tōkaidō Shinkansen currently take 2h25)
From Wikipedia: "On December 25, 2007, JR Central announced that it plans to raise funds for the construction of the Chuo Shinkansen on its own, without government financing."
It's roughly comparable to:
* Ottawa->Toronto (449KM)
* LA->San Francisco (622KM)
* Washington DC->NYC (363KM)
As opposed to 220 mph top speed in the year 2029 for california "high speed" rail.
What a bright, wondrous future we will all be living in!
I think California's high speed rail project should be cancelled, but big infrastructure projects do cost a lot of money and take a long time, both in Japan and the US.
According to the WSJ, 6 million people per year travel between LA & SF via air every year. I can't find highway numbers, but I gotta believe it's about the same order of magnitude, if not higher.
Improve BART, VTA light rail and CalTrain (in the Bay Area), and I suspect it will have a much larger positive impact on the lives of more people.
All of the above need to be done, both will have a positive impact of even more people.
I don't know, it just doesn't seem like a very compelling argument to me. The state doesn't have unlimited resources. Spend the money where it will do the most good.
[1] http://www.hsr.ca.gov/docs/newsroom/fact%20sheets/Good%20for...
[2] most recent month with available statistics, lots more data available here http://traffic-counts.dot.ca.gov/
In highway terms, that's a significant reduction. A reduction on the order of 1-3% (it depends on a number of factors including number of lanes, and distance between exits) can get you from LOS F traffic (stop & go) to LOD C/D traffic (heavy, but moving traffic).
My main issue is the way they are going about it, which is a highly politicized construction process along with some really out-of-order prioritization.
It would be much better to start with the low hanging fruit, like grade separation and electrification of Caltrain. That line would benefit immensely from some major upgrades, such as longer station platforms. To be fair, the most recent round of upgrades (ctc, quadruple track sections, new rolling stock) have been very well done.
I thought so.
CA HSR authority signed a construction contract with Tutor Perini to start construction in the coming weeks. It's happening.
* In the meantime, projects like the Southeastern High Speed Rail Corridor [..] will be starved of funds.*
This isn't an either/or situation, we can (and are) doing both.
The portions that must be worked on first is the crossing of the Tehachapi mountains, as it is the most time consuming portion. Yet instead, they are constructing line in the southern Central Valley.
I agree with the pessimists. Much as I want high speed rail, I doubt it will happen.
The section which would see that would be from Martinez to Davis. That segment sees many capital corridor trains daily and would immediately benefit from high speed service. What they are working on now sees a small fraction of the ridership, iirc.
Not necessarily - a lightly traveled starter corridor works well for a new system in terms of minimizing disruptions when the inevitable problems crop up.
To be honest, if it were up to me, I would recommend starting it where it would get the most ridership, but the CHSRA has a legitimate argument here. Also the project can more easily deal with adverse impacts in "the middle of nowhere" better then it could in a more heavily populated area.
The other important thing would be more and better business class cars at a fair price. Business class should have strictly enforced quiet, be spotlessly clean, with totally reliable internet access.
So I wouldn't expect there will be a lot of room for improvement of this design over the next 30-60 years. It will probably cost a lot more than expected as well. Comparatively, there are a lot of new technologies that could deliver major improvements in transportation efficiency and speed without the large capital investment of a maglev line over the next 30-60 years from traditional rail to self-driving cars to new aircraft.
I'm really skeptical of the wisdom of this project to be honest. If you want a maglev design you might as well go with a near-vacuum tunnel and more than triple your speed rather than just increase it by 50%. This would also have the advantage of eliminating the noise issue. I believe China is looking at something like that.
Though i think a partially evacced tube would be amazing as well.
In 30 years we'll probably have more efficient airplanes, and less fuel, so higher prices. Maybe it's more expensive in the short term, but it's much more sustainable to have ground-based transportation for trips under 400 or 500 miles.
In Spain, we have the Madrid-Barcelona route. It's 50 minutes by plane and 2h30 by train (620 km, 385 miles). Airports are outside cities, stations are in the center of them and very well connected by road and commuter trains from everywhere. It's gone from being one of the busiest air routes to losing more than half of its traffic to high speed train. Why? Much more comfortable and, in the end, takes the same time.
Jet propulsion and magnetic propulsion are fundamentally different. There are limits to what those magnets can push/pull, how much energy can be put into the system, and the stresses involved coming from the fields.
Can maglevs use jet propulsion to go faster?
So yes, but you wouldn't want to
If the boys in the ministry really wanted to boost Japan, they'd be investing in renewable energy, not playing with train sets. But there are too many vested interests...
From Wikipedia: "On December 25, 2007, JR Central announced that it plans to raise funds for the construction of the Chuo Shinkansen on its own, without government financing."
A project of that scale could not possibly happen in Japan without whole-hearted government support.
(I know I sound like a grumpy cynic, but I've learnt from experience that one can rarely go wrong being cynical about powerful Japanese institutions.)
Simple general cynicism is all well and good, but it isn't really worth much absent actual evidence.
This is particularly true in the case of JR-central / east / west, which are well-run and solid companies, and a model for how to do privatization successfully.
361.0 mph in December 2003
343.0 mph in April 1999
329.9 mph in December 1997
(And I have a sneaky suspicion that Japan's maglev, running in a depopulating country with economy in a terminal downward spiral, will end up as marginal and unprofitable as the Concorde, but that's another story.)
1. http://en.wikipedia.org/wiki/Shanghai_Maglev_Train 2. https://www.youtube.com/watch?v=y-54gBLwK3s
I assume these have the potential of going significantly faster than normal trains making braking harder. In this test though they didn't reach even the peak speed of normal trains. Apparently the french TGV has the record for normal trains at 575km/h[2] (vs 500km/h in this test) even though normal operation is "only" 320km/h.
[1] https://en.wikipedia.org/wiki/Maglev#Power_and_energy_usage
In fact, three countries probably most often praised for railway quality would be Switzerland (barely any HSR, and huge fail, and while they are adding more tracks between Zurich, Bern and Geneva, they're going to be used by local traffic as well), Netherlands (where railways were limited to 140km/h for way too long, and HSR is also limited) and Germany (there is an extensive HSR network, but it's significantly slower than the French one. All also because getting it faster would cost more than it's worth for them). French HSR is excellent, but the railways in general are a bit lacking (but also used to the point of track and station saturation).
Anyway, one possibility many people ignore unfairly (in my opinion) for longer routes are night trains: you might arrive on the same day, but modern night trains often offer a hotel-quality accommodation, so I will be there in the morning, rested, and the time I've spent on the train will be time I'm sleeping anyway - so in many ways the trip actually would take less time than for an airplane or fast rail. And it's far more energy efficient as well.
Also note that the MLX01 demonstrator (a better equivalent to the customized trainset used in the TGV record) has reached 581km/h. It's also done so on the 42km Yamanashi Maglev Test Line where V150's run took a ~140km section of (non-test) track.
And the first section of Chūō Shinkansen should be open in 2027, with partial opening possible as soon as 2020.
FWIW, even standard (non-maglev) high-speed rail construction are not short-term projects, the 300km LGV Est Phase 1 took 5 years between the initial earthworks and the line's opening and France isn't exactly as mountainous as Japan.
The 787, for example, which is just trickling into fleets now, was in development since the late 1990's (15 years ago). Power technology has developed even more slowly. E.g. the efficiency of coal power plants has only improved by about a factor of two in the last century or so. Heck, even computer technology is progressing more slowly these days. E.g. I wouldn't call Win2k obsolete, but it's 13 years old now!
So yes, the train will be a bit behind the state of the art by the time it's released, but it won't be obsolete.
Many space missions NASA designs are quite affordable, and the SpaceX innovations will make them even cheaper.
http://en.wikipedia.org/wiki/Financial_cost_of_the_Iraq_War#...
My personal rule of thumb[0] is modern HSTs (280~320km/h top speed) are superior to plane up to ~1000km, and can remain competitive to 1500km.
(although, though that's much more of a personal advantage, having really shitty ears and great difficulty with pressure equalization the odd train tunnel — even at high speed — is much less painful than going from 0 to 30k ft and back)
[0] modulo specific settings, including the current security theater shit which I don't have to experience on train and considering that most of my experience is on european lines where city center to city center is what you want and airports are commonly 30~40mn away from city center
I write this as someone who has had two cancellations and 6 delays over ten air trips in the past three months.
EDIT: Correction, I took the commuter train from Sol to Chamartín, so I do not actually know if there are security checks at the commuter trains at Atocha. But I assume not since it would not scale and there were no checks at the other stations.
They run their tracks right next to each other, so trains are designed to not suffer major pressure changes from passing trains or tunnels.
The only things I'd really change are the price ($48 round-trip is a bit steep as a college student) and the lack of wi-fi. The vast majority of commuting professionals have cellular modems though.
It's really great to be able to move between cities in reasonable time without owning a car, buying gas and insurance, or trying to find somewhere to park for less than the price of a firstborn son anywhere useful in Chicago.
I've pulled out my iPhone speedometer app on the train and it clocks at around 80 in the middle of nowhere, 65ish in the northern Chicago suburbs.
Another way to put it: What about a 310 mph maglev on a solar-panel shaded elevated track between SF and LA?
(You have read Elon Musk's proposal, haven't you?)
(Paid attention to basic economics, physics, and math, haven't you?)