SF to NY in 45 Minutes? Evacuated Tube Transport.
thebat-sf.com
thebat-sf.com
Do you have to inspect every single joint (which I assume would be welded) for air-tightness?
How do you keep the tubular structure from buckling? Do you have buckle-arrestors every so often along the length?