Drax originally claimed that the imported wood would only be used while UK supply was built up. Needless to say, that never happened.
Then, once it became clear that the plan to source from the UK wasn't going to work, they claimed the subsidies should continue to enable them to fit CCS kit. Needless to say, that also hasn't happened.
Taken separately, you could probably squint a bit and say that either scheme was fair enough - worth trying, if only as a minor hedge against unexpected problems with more promising renewables + storage schemes. But taken together, it's hard to ignore the pattern of repeated failures wrapped in endless dissembling.
Time to pull the plug and turn the site (and its huge grid connections) into a giant battery storage array with a bit of useful solar draped over the top.