Try to grab a train from San Francisco to LA. That's about 400 miles. How long would you expect that to take in this future of which you speak?
Try to grab a train from San Francisco to LA. That's about 400 miles. How long would you expect that to take in this future of which you speak?
Getting the Eurostar from London to Paris would take you no more than three hours (2:15 for the journey, checking in 45 minutes before departure). Flying from London to Paris would take two hours (1:15 for the journey, again checking in 45 minutes before departure), but you've got to get to and from the airport, whereas the train is taking you directly into the city.
Across medium distances (SF to LA, Paris to London, etc) high speed rail typically provides better passenger comfort, lower CO2 emissions, and travel times as fast as flying once you factor in transit.
This is made even more bizarre by the fact that St. Pancras where the Eurostar terminates is one of the only train stations in London which is located such that trains heading out need to "turn around" to get where they are going. You'd think the Eurostar would terminate south-east of London since that's where the train travels, but this one breaks the rules.
Oh, and EasyJet is probably cheaper than Eurostar to Paris if you don't have a lot of advance notice. I still love the trains, but you didn't pick the best example!
You have ebbsfleet and Ashford for passengers from south of the city.
Also, it would have cost vastly more to put full high speed lines required in most of the way to London Waterloo.
From: http://en.wikipedia.org/wiki/High_Speed_1
" The next plan for the Channel Tunnel Rail Link involved a tunnel reaching London from the south-east, and an underground terminus in the vicinity of Kings Cross station. However a late change in the plans, principally driven by the then Deputy Prime Minister Michael Heseltine's desire for urban regeneration in east London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing the underused St Pancras station as the terminus, with access via the North London Line that crosses the throat of the station.[26] "
You walked to work? Good on you... ;)
Regarding the article, I'd like to see them plot the rate-of-change: how long it took to go from a month to a week to a day and so on, and then continue it into the present day. I think we've hit something of a cap on speed.
The biggest thing slowing down US passenger trains is that the routes are leased from freight lines and the freight trains take priority.
Edit: Also, I would be interested to know how long it would take by bike if you happen to know :-)