So you figured out this glaring hole in their plans that all the idiot companies doing SMRs missed?
Maybe not.
For example, Aalo Atomics has split the construction process in such a way that the on-site pour that happens after the reactor is delivered from the factory is (a) very simple (b) standardized, and (c) non-nuclear. In addition, the site work that is required is very repetitive, so you get a positive learning curve, again without the slowness of nuclear construction.
Copenhagen Atomics has heavy thorium salt shielding inside the nuclear core and a "Cocoon" that is delivered in 12 prefab parts installed on a regular concrete pad. So on-site construction is making the non-nuclear concrete pad, installing the pre-fab cocoon on pad and then placing the reactor core inside the Cocoon.
Westinghouse apparently ships the entire eVinci microreactor pre-assembled with shielding.
X-energy puts the reactor in a hole underground.
etc.