For example: Spokane to Seattle is about 230 miles in a straight line, or 280 miles driving. A flight takes less than an hour (not even 40 minutes of which is spent in the air) and costs $80-130 one way. A train traveling 200mph nonstop would take 1 hour 24 minutes. Building high speed rail costs $20-$200 million per mile (the upper end of that is California HSR). If we optimistically assume $20m/mile, constructing the line will cost $5.6b. If all SEA-GEG passengers (677k per year) choose to take rail instead of flying, and we want the project to pay for itself after 50 years, then each ticket will need to cost $165. This also assumes no cost to maintain or operate the rail line.