> Even Flameville 3 in France was significantly cheaper than Hinkley point C
Per wikipedia: initial cost estimate €3.3 billion, cost in 2020 (6 years before it was done) €19.1 billion, so 5.8x the budget. Supposed to enter operation in 2012, entered in 2026 "only" 14 years late.
These are terrible results.
That EPR2 series are "expected" to cost less says absolutely nothing. Flameville 3 was expected to cost 83% less too, and I except that if they swindle people for the money to build it we'll see it'll be just as much of an overrun.
The nuclear industry seem absolutely incapable of sticking to a timeline or budget. And any one of these failures should have been disqualifying. But they get to do it over and over again.