> "The output from the SM_FORCES application code as required by a MSOP Project Software Interface Specification (SIS) was to be in metric units of Newtonseconds (N-s)"
(MSOP = Mars Surveyor Operations Program). One of the recommendations was
> "Conduct software audit for specification compliance on all data transferred between JPL and Lockheed Martin Astronautics"
So yes, NASA should have checked the provided software more thoroughly, but also Lockheed should have actually followed the spec they were given. I doubt the SIS is available online to check any harder
Both parties fucked up.
Lockheed's job is to follow the customer's specifications.
NASA's job is to check to make sure what they paid for is what they received.
I do this every single day as a quality inspector here. I don't know why a bunch of highly-degreed engineers can't do a simple job that a person with oonly a GED does without fail.
Tell me you don't run AS9100D quality inspections without saying so directly.
Besides it looks like the first AS9100 Standard was released after the incident even happened - perhaps even as a result of this.
So it's totally irrelevant that you both audit software in the space and know the Standard, no pun intended
Again, tell me you don't actually handle quality without directly saying so.