In the United States at least there's been plenty of polling on why people oppose data centers. Consistently, it's water usage and water contamination fears, which is exactly what you see most often in social media and discussed online. I think a lot of high-minded rationalizations are just trying to dodge the embarrassing fact that people simply think data centers are draining municipal and natural water sources.
Here's a recent source: https://pacinst.org/publication/how-much-water-do-data-cente...
Which is being demonstrated by the use of state power to kill data center development.
Little Red hen, why do you get to choose who get's to eat your bread?
That's all it takes for them to do their part in generating gargantuan amounts of value for people who live 1,000 miles away and their uberwealthy hardly-human CEOs and investors.
https://fieldreport.caes.uga.edu/publications/TP121/how-data...
One recent-ish example: ^[1]
> ... or is it being caused by poorly executed construction practices?
I believe their contractor was responsible for this one IIRC?
[1]: https://www.forbes.com/sites/victoriaforster/2026/07/09/meta...
1. Replacing forests and fields with concrete buildings prevents rainwater from filtering into the soil, which stops local aquifers from recharging.
2. During storms the rain runs off impervious surfaces and can cause downstream flooding.
3. Heavy land grading washes loose sediment into nearby waterways, destroying aquatic habitats and turning private drinking wells muddy. (That especially gets local homeowners angry and gets lots of video views).
And then you have the ongoing operation of open cooling systems:
4. Evaporative cooling systems discharge concentrated mineral brine that spikes the salinity of freshwater ecosystems.
5. Cooling water is treated with toxic biocides and anti-scalants that can contaminate local water basins. It can also contain leached copper, zinc, and PFAS.
6. Discharging warm wastewater depletes oxygen in streams and alters the overall ecology.
Of course all of these issues could be mitigated to a reasonable degree with proper care and effort:
>this seems like it shouldn't happen if things are being done properly
Do you want to bet your whole town on things being done properly right now?
The first 3 apply to all construction. It's just being selectively applied because people hate datacenters.
For private wells: if you're a rural person who previously had perfectly fine water, and now someone comes along to mess with that, even if it "just" requires installing expensive new equipment, you're going to be pissed.
Items 4 and 5 apply to any facility with cooling towers, not limited to but including hospitals, apartment buildings, schools, prisons, cold storage warehouses, combined cycle power plants, large commercial buildings, paper plants, retirement homes, commercial bakeries, industrial facilities with heat rejection needs, etc.
The sixth one applies to virtually every power plant in existence.
I don't doubt that politics plays a role, but we also can't deny that the current moment is a different category.
Amazon was forced to settle for 20 million which will pay for digging to find uncontaminated water sources deeper in the ground. They'll also pay for water treatments to help remove the excess nitrates.
Data centers don't have to bring in new toxins and pollutants. They can also make existing problems much much worse.
Farms use an order of magnitude more than either. You don’t see any demands whatsoever on agriculture to reduce water usage.
That's just status quo bias, given that they're an ongoing source of water consumption. "oh it doesn't matter that [thing] is guzzling water, because it's already there!".
This whole thing is a sublimation of vaguer anxieties about AI (which are perfectly rational!) into areas where people feel like they can make more concrete objections that are likelier to succeed. The water thing is completely fake, whether people think so or not.
I think it’s pretty reasonable to conclude that their beef is not really with water usage as much as a general hatred of AI, big tech, etc, and water usage is an easy thing to focus on.
The difference is they already exist while the datacenters don't. And its a lot easier, in a democracy, to stop a thing from being built in the first place than to tear it down after the fact, what with pesky laws about private property and so forth.
Or are you really saying that if we can't solve all water usage problems then we shouldn't solve or prevent any? Is that what you're suggesting?
Instead of replying to your rather silly question I’ll just point to this sibling which I’ll co-sign: https://news.ycombinator.com/item?id=49568295
Perhaps I just struck a nerve.
"We estimate that data centers caused average retail electricity rates to fall modestly in the United States from 2015 to 2024 using an instrumental variables approach."
But the data center backlash really started 2 years ago. It's 2026 now. Getting new energy generation built and approved takes time.
"We caution that future supply constraints could reverse the effect."
There it is.
Monthly private spending on data center construction:
2015: $168 million
2024: $1.59 billion
10x increase over 9 years (26% annual growth rate)
2026: $4.36 billion
3x increase over 2 years (73% annual growth rate)
Let me reiterate: MONTHLY spending.
Compound this with presumably we've gotten better and not worse at building data centers (if nothing else, just building larger data centers would create economies of scale), the construction dollar to power consumption ratio has probably moved in the wrong direction for your argument.
The 2015 - 2024 growth curve would conceivably encourage more consistent usage of baseload and, where insufficient, gradual construction of additional supply. That would have the expected effect as seen in the paper.
The latter growth (which is obviously accelerating), especially after an extended period of the former growth, would not necessarily do this. We in fact know this to be true because the rate-limiting step on data center construction is lack of energy.
So obviously there is not ample excess baseload just sitting around. Obviously it's non-trivial to add additional capacity at the speed data centers need it.
I am saying the paper's scope of analysis (up to 2024) renders it pretty much irrelevant.
The paper was posted on the 18th of June. I would guess that means they started writing the first draft in the winter of 2026, if not earlier. 2026 data obviously wouldn't be available then, or even now---we're only in September!
In fact, most data products take a few months to compile and distribute. The US will release its Q2 estimate of GDP at the end of September, for example; Statistics Canada is on a pretty similar schedule. Thus, 2025 data might not have been available when they started writing either. It's certainly possible to estimate things on your own, but now you need to show that a) your method of estimating GDP (energy prices, whatever) is valid and b) any effects you see aren't simply due to using different metrics.
In short, it just takes a while to do and write up research.
it's my power bill, dude. and everyone else's around me. your paper stops measuring that data right at the time when everyone's bills started increasing sharply.
And the effects of Iran War are not apparent.
I would recommend reading the actual paper where it acknowledges that it does not regard capacity payments.
> How can higher demand lead to lower prices? … a bump in demand can allow for higher utilization of the existing generation … Provided the bump does not violate capacity constraints
I.e. data centers reduce electricity prices, as long as you don’t build new generation to support them. Whereas data centers, nationally are projected to increase energy use between 325 to 580 TWh annually by 2028 [1]. There is no way you are going to meet that without building new generation assets to meet that demand.
[1] https://www.energy.gov/articles/doe-releases-new-report-eval...
where I am the water is a part of it, but a big issue is electricity prices going up (which they will)
The study's authors acknowledge it in the text.
> We estimate that data centers caused average retail electricity rates to fall modestly in the United States from 2015 to 2024 using an instrumental variables approach.
This is a good primer on capacity payments: https://www.energyknowledgebase.com/post/capacity-payment
Is it any wonder people hear that and go "hmm, no thanks" when the prospect of a massive whirring data centre next to their house is raised?
The SV LLM crowd know a lot about LLM psychology but seemingly very little about human psychology
They're detached from the great unwashed masses. It's not that they don't know anything about human psychology. They don't care about those people or their concerns, historically. And that's what is coming out in this interfacing with the broader public.
And what exactly is the benefit to you to having a data centre specifically in the area you live? Seems to me that far from “irrational hordes”, the protestors are standing up for their interests above the interests of the AI companies.
The question should be, do you prefer to have them also built in the US or do you agree to have China (or another country) controlling AI in the future?
If AI is really gonna make everyone unemployable, then it seems to me like you would want them to be built in your country, not in another country, especially not one you disagree with.
Of course they're still the question of where exactly there are built and how to compensate for the nuisances they may bring.
I doubt that it's ignorance on their part. I think their target audience with those comments is the US government, basically setting up OpenAI/Anthropic as "too big to fail" in the sense that "if AI is _inevitably_ going to take away everyone's jobs, then we'd better make sure that it's US AI and not Chinese AI or some "rogue AI" that's doing it, and the government should 1) be in bed with us, 2) provide a financial backstop, and 3) not regulate us or put on the brakes so that we can stay ahead of the Chinese.
They don't care what the "normal" American thinks.
Here in Switzerland new AI datacenters are also causing some uproar but a lot less because regulations are rigid enough in most places that you can only build them if you do so cleanly. You can't just take all the water, electricity, make noise and polute.
I live next to a waste valorisation plant and they have very over sized water cooling systems because they need to keep the noise below regulation. They also for example have under pressure in the trash receiving bunker to prevent smells from escaping. All regulations that cost money but are the benefit of all.
Yeah, Elon's a big fan of this tactic.
> A US regulator ruled on Thursday that Elon Musk’s artificial intelligence company had acted illegally by using dozens of methane gas turbines to power huge datacenters in Tennessee.
> xAI has been fighting for a year and a half over truck-sized gas turbines the company had parked near its Colossus 1 and 2 facilities, arguing to local authorities that the electricity-generating turbines were exempt from requirements for air quality permits.
Why is that?
Where I live my energy bill is a fixed cost. It's a super expensive fixed cost, since I'm living in Germany, but it is fixed none the less. It increases year by year because all costs only go up, but it remains completely unaffected by unrelated infrastructure being built around where I live.
I've been to a data center before due to work and my impression of the place was really good. It's kinda invisible from the outside, everything is extremely clean. There's no noise on the outside and the excess heat is used to get people cheap warm water or something like that.
I'm quite confused why people suddenly hate on them. Feels like I'm missing a whole lot of context.
Infrastructure requires new capacity to be build, which requires capacity payments.
You won't get approval if whatever you want to build would impact things that way, meaning before you can build or even expand something like a data center you have to make sure the capacity is there or pay yourself to build it or pay to get a direct line from outside the city. Either way, other people won't need to pay more because of it.
Then these big buyers go ahead and pay 50% of what everyone else is paying.
These new AI data centers are now built with their own power generation capacity. They're too electricity hungry to be supplied by the local grid, requiring megawatts to gigawatts of generation. If they're grid-connected at all (for training / inference racks + cooling) it is secondary supplementation.
There is a concerted effort by foreign governments to slow down American progress in fielding AI capability. Attempts to generate civil unrest and propaganda against $new_thing are included in this.
> These new AI data centers are now built with their own power generation capacity
And now you've got all the noise and pollution from that to deal with.
The outside agitators are in the news. The U.S. just happens to be a little more vulnerable to "straight to the people" propaganda campaigns.
Also, I live in Northern Virginia where we have tons of data centers, and energy prices have not spiked.
That is now being consumed and now Loudon County will also start engaging in electricity price wars with data centers. New regulations to segregate markets is supposed to kick in on Jan 1 2027, in fact.
But also, it seems to have increased in price quite a bit lately.
... I'm not sure you realize the size of a modern hyperscale datacenter? They're pretty dang big.
The amount of earthmoving to bury one would also be awful for the environment. There's really no need to complicate it that much, they're big warehouses full of computers, just shove them on some unused industrial land somewhere as is already being done.
They should be required to pay for new renewable generation, I agree. That much is common sense.
I know that's what the rhetoric focuses on, but is it the real issue? The people I know personally who are against "data centers" are really just against AI, period. "It takes jobs from artists, it's going to take my job, it's going to enrich a handful of oligarchs," etc.
I suspect that even if some magical breakthrough meant that AI usage could grow and grow without building a single new data center, these guys would still oppose AI.
And understandably so! "I'm worried that AI will take my job" is a reasonable worry, for many jobs! But I feel like "data centers" is, for many people, a pretext.
> Your requirements is like demanding nobody can buy a house unless they have pay they entire amount upfront.
No it's like demanding your new neighbors aren't forced to lend you money for your purchase - which is entirely reasonable. If you need money, get it from the bank.
The top-level comment explains it already:
"When you drop a data center into an area, energy prices will spike. Additionally, without that green energy capacity they will cause much more air pollution."
Is the idea that we'd build the data centers now, and finish the nuclear plants to power them 11-12 years from now?
https://www.researchgate.net/figure/Typical-timeline-of-a-nu...
https://jmhpower.com/how-long-does-it-take-to-build-a-wind-t...
That's still better than 11-12 years. How long does a solar farm take?
If residents' opposition is rooted in higher power prices, data centers could just pay extra instead until the new capacity comes online. Seems like a cheap way to pay off opposition.
> An offshore wind turbine project requires about 7-10 years.
Given this article is about Pennsylvania, it'll probably take millions of years.
24–48 months, but for a data center that has to run 24/7 you need to also build a gas power plant.
https://www.pvfarm.io/blog/utility-scale-solar-project-devel...
https://globalenergymonitor.org/research/betting-big-data-ce...
Also residential and industrial use will be lower at night. So the existing grid supply may also be enough.
The famous evening duck curve, when people go home and cook and turn on heating/cooling appliances. California is able to flatten that out with batteries alone.
https://eticaag.com/battery-storage-and-the-duck-curve-march...
> during night
When everyone's asleep? Serious doubt, please show your sources.
Lot of industry, especialy heavy industry, chemical plants are running 24/7.
For expensive night prices see electricity prices in Europe, expensive natural gas, coal power production with carbom tax.
https://app.electricitymaps.com/map/zone/DE/live/fifteen_min...
Right...so they also run during the day (that's what 24/7 means), when everyone else is using electricity. At night they're the only users. Which means less demand at night compared to the day.
> see electricity prices in Europe
This article is about Pennsylvania. That isn't in Europe.
You are right, PJM grid is coal, nuclear and gas dominated.
https://app.electricitymaps.com/map/zone/US-MIDA-PJM/live/fi...
* Highest is 14:00 until 18:00 or 21:00
* Lowest is 23:00 or 24:00 until 6:00
* The longest piece for wind is "Approvals and permits" which takes up to 5 years of the 4-7y.
* The building part "takes approximately 3-6 months" for building wind.
So wind can be built far faster if we're willing to speed up approvals and permitting. And even if corners are cut for approvals/permitting, the worst case for a wind turbine failure is a lot better than a nuclear failure.
Have data center companies mortgaged their property to the public and paying interest on "power loans" monthly ? Please correct me if I am ignorant.
Three Mile Island
"2027 – Nuclear Regulatory Commission to decide whether to issue operating license to Constellation Energy, with the decision expected in May. If granted, Constellation expects to bring the reactor back online later in the year."
https://www.witf.org/2026/07/28/three-mile-island-reactor-re...
Michigan’s Palisades nuclear power plant
https://www.canarymedia.com/articles/nuclear/americas-first-...
Duane Arnold Energy Center in Iowa
https://www.reuters.com/business/energy/nextera-energy-partn...
https://en.wikipedia.org/wiki/Duane_Arnold_Energy_Center#Res...
Though we really should get better at building nuclear power plants. I'm think more of small ones to power ships though, not land based ones. Ships are one of the few places where oil/coal are used that there are not realistic renewable alternatives.
2. Nuclear Safety Commission Chairman Haruki Madarame told a parliamentary inquiry that "Japan's atomic safety rules are inferior to global standards and left the country unprepared for the Fukushima nuclear disaster". There were flaws in, and lax enforcement of, the safety rules governing Japanese nuclear power companies. [4 (Bloomberg: "Nuclear Safety Chief Says Lax Rules Led to Fukushima Crisis")]
3. Additionally, your source is from more than 5 years ago; in those additional >5 years, neither of the 2 under-construction Japan plants (started in 2006 and 2010) have finished, and 1 is not expected until 2030 (I couldn't find an expected date for the other).
4. The phase you mentioned is a relatively small amount (~1/3) of a nuclear reactor's total startup timeline. [6]
5. Japan was the fastest country from your 2021 source (before taking into account that current JP builds are taking 20+ years).
6. The last Japan reactor to go online was in the 2000s [1 > OPERATION].
[1] https://cnpp.iaea.org/public/countries/JP/profile/preview
[2] https://en.wikipedia.org/wiki/%C5%8Cma_Nuclear_Power_Plant
[3] https://pris-stats.iaea.org/reactor/862
[4] https://www.bloomberg.com/news/articles/2012-02-16/nuclear-s...
[5] https://www.researchgate.net/figure/Typical-timeline-of-a-nu...
Currently, economy of Japan (world biggest LNG importer) is hit hard by the events in Middle East. Because of this goverment starts maximum use of nuclear power policy.
https://www.nucnet.org/news/japan-council-adopts-policy-pack...
https://www.powermag.com/reactor-restart-rekindling-japans-n...
https://ieefa.org/resources/japans-diversified-lng-procureme...
https://world-nuclear.org/information-library/country-profil...
* Externality costs for items like pollution
* Any required insurance cost during their lifetime (not subsidized)
* An up-front bond or similar to cover final decommissioning and any required long-term storage costs (again, for fossil/renewable/nuclear)
(Of course I might simply be projecting.)
I can almost guarantee there's a good bit of that also involved in addition to all the other concerns and issues folks also rightly have.
Also, adding a few data centers to a large grid shouldn’t bump up the energy prices, it’s only when you add many across the area. This is difficult to pin down because if one side of a region builds many data centers without their own power generation, the whole region could see eventual price increases. Fortunately most (all?) states regulate utility price increases, but still you don’t want to max out the price bump year after year.
It’s hard to discuss because different facilities have different configurations, and the local impact depends on that plus local characteristics.
Given the externalities of large facilities like this, impacted neighbors should definitely get a vote. Maybe we need a standard to define the impact radius based on the facility characteristics. This would add transparency and make it easier for people to decide without FUD and distortion. Unfortunately I don’t have much confidence in anyone coming up with such a standard without altering it to benefit their side, now that it’s become a political football.
S'okay. Facts and reality don't matter. Everything's peachy-keen, folks. Just wander on by and downvote reality and it'll magically go away... :sigh: