The core issue however was accumulation of technical debt (architectural changes in how timing systems were managed were not being tracked) and not recognising NTP as a sovereign system that needed to be properly managed.
> At the time of the October 2025 incident, the personnel involved did not recognize the meaning of Melbourne NTP at stratum 5; that looping was already occurring in mobile core timing when an intended NTP stratum 3 server was able to become a client of one (or more) of the clients and that a circular loop was established when the stratum 2 source was lost. This anomaly was observed but not noted and no problem ticket was created for further investigation.
Two opportunities to raise tickets and nothing was raised.