Considering doing exactly this, hopefully by the time M7 Ultra is out, the RAM Apocalypse will be over.
I really don’t see how they can avoid it not in the current climate, the design and engineering is already there, 10 to 20 billion dollars is already there, all they need to do is partner with Intel or TSMC onshore in the USA, Arizona would be fine. but Prineville Oregon would be better.