Congrats on breaking ground. Curious about the electricity input side. Reforming is endothermic, so I assume the unit has a meaningful power draw. At a wastewater plant, do you run off the facility's existing service or do you need a utility upgrade, and can the unit ramp with power prices or does the catalyst want steady state? Asking because at small sites the electrical interconnection can quietly become the long pole even when the gas is free.