Greenpeace Gets It Right: More Wind Power In Erie A Good Idea
treehugger.com
treehugger.com
For more detail on land use, see this page:
Nuclear power requires orders of magnitude less land surface area. Waste produced can also scale underground. Yucca mountain doesn't actually take up much of the surface of Yucca mountain.
http://greenoptions.com/2007/07/26/nuclear_power_is_green_re...
Re. "orders of magnitude" see the page below.
http://www1.eere.energy.gov/geothermal/printable_versions/ge...
Quote: An entire geothermal field uses 1-8 acres per megawatt (MW) versus 5-10 acres per MW for nuclear operations and 19 acres per MW for coal power plants. Coal power plants also require huge acreages for mining their fuel. These mining operations can involve large-scale movement of earth for construction of underground mine shafts and tunnels, waste heaps, and/or open pits. Disturbed surfaces from open pit mining also can limit plant life participation in the carbon cycle and evapotranspiration, which replenishes water in the atmosphere. Adequate remediation of strip-mined areas can be expensive too.