“I don’t really know much about that, go ask _____” is the desired response in that situation
The right way to solve this is for the PM to forward it to the ME who designed the brobillator and calculated the 1-month maintenance interval, CCing the controls engineer who helped ensure that machine wouldn't eat itself with the fault and low-speed mode.
The wrong way to solve this is for the PM to forward it to ChatGTP[sic], which might mindlessly suggests maintenance-free sealed bearings (that are totally inadequate for the temperatures and contaminants). If he asks the mechanical engineer to redesign it like ChatGTP suggested, that situation may be salvageable. If he told the customer that they'd have an engineer out in 3 days with new sealed bearings it's bad.