And let's not forget that they are investments, not just stranded costs (it's baffling to see them discussed that way to and down the thread). You get something back for having built them and the barrier to entry is the upfront cost, which is easier to overcome if you're a state spending on infrastructure.
Some people actually have an idea of how electricity works and statements like these make them think that the whole renewable energy industry is one big scam.
In your opinion, what percentage of the total cost is involved in tapping into the existing grid from nearest wasteland?
Same in parts of the UK. Scottish renewables are bottlenecked on transmission to London.
Whereas connecting generation to a substation near demand usually shows up as "negative demand" and doesn't require big upgrades.