The rest of the infra is fine if that can be done. Array of batteries and/or capacitors at the supply point and draw continuously from the grid.
Most entertainingly run a diesel generator on site if that doesn't work out. Lines up well with basing them at the existing fuel stations, got the diesel supply already sorted out.
Put a bunch of solar near it when you can. Maybe sell back to grid, nice to have the extra capacity available.
All comes down to capital deployment at that point. Do the calculations on how much to charge for slow car charge vs fast charge, fallback to slow with an apology/discount when the infra is struggling etc.
Huge news. Iff the cars don't catch fire when plugged in.