You didn't read the report or search for information about the matter, but I have not problem to repeat it for you,
The General Electric's design was originally designed to be placed 30-35 meters above the ocean, instead of this TEPCO modified such design and constructed at sea level (almost) recurring to studies convenient to their purpose, cheaper, this in one of the more tsunami-prone countries, with an history of ones reaching 20-30 meters. When those -for them- convenient studies was not longer justifiable, as deeper studies did finally refute them, they decided to just keep ignoring all the warnings and requests to reinforce the safety. They knew the nuclear plant was in danger, they always knew it, General Electric didn't designed at 30-35 meters above the ocean by coincidence, and this happened with a supposed regulator always closing the eyes to this, conveniently, across those years, ignoring even pipes with fissures.
Well, this obviously suggest negligence to me. Decades of bad decisions with a strong smell to corruption.
> You're not saying what tolerances you want them to design to.
What about tolerance to avoid a meltdown of the core, specially under two events, an earthquake and a tsunami, exactly what happened after ignoring the warnings and requests to reinforce the safety.
> Oh well then. I had no idea. I thought the consequences were minor and now I have learned ... there you go, I suppose. I'm not really sure what to do with this new information.
Keep the sarcasm for other places, if you don't mind. It is not a mere gentlest engineering disaster as it reached the whole planet, with ate TEPCO's cesium-137, specially the Japanese. And it is not a mere gentlest engineering disaster when you have to force vulnerable people to go to ground zero to move contaminated land and water.