Realiy is you don't solve these problems by to relying on everyone to be perfect - everyone slips up - to achieve results consistently you need process/systems to assure quality.
Safety critical system should be even better equipped to adopt this because they already have the systems to promote correct outputs.
The problem is those systems weren't built for LLMs specifically so the unexpected failure cases and the volume might not be a perfect fit - but then you work on adapting the quality control system.