https://www.reuters.com/world/spains-deadly-rail-accidents-p...
https://www.reuters.com/world/spains-deadly-rail-accidents-p...
> [The] stretch of track that was renovated last May and inspected on January 7.
The track had been inspected very recently. Maybe the inspection standards are inadequate?
The linked article also shows figures that are quite meaningless without context.
> [The] vast majority [of Spain's high-speed rail budget] went to new infrastructure with only some 16% earmarked for maintenance, renewal and upgrades. That compares with between 34% to 39% spent by France, Germany and Italy,
They simply can't compare those numbers as-is. Of course Spain will be spending less in maintenance as a percentage of the total budget if it's still mainly building new tracks. It's not a useful figure.
Spanish officials are very good at deflecting blame and playing politics. Nobody wants to be held accountable for a catastrophe. Also see the 2024 floods in Valencia; a partially preventable tragedy, followed by a whole lot of mud slinging, but zero accountability.
So while inspection standards might be inadequate, I would take anything a senior official says with a pound of salt.
sigh
Of course you're right
English has a third term like that as well called 'brazing', then there is silver solder (a high temperature version of soldering), in dutch we'd call that 'hardsolderen', whereas what the English call brazing we call oxy-acetyleen lassen (which is more of a process name by virtue of naming the ingredients).
Soldadura autogeno and Soldadura en el arco (sp?) are what I think the modifiers used in Spanish to indicate brazing and (arc) welding.
In Germany it would be schweißen.
So, also different with different etymology in a language from a different group (although these things were probably influenced by German)
* the first one makes it clear a something (a different material) is used to join things together
* the second one implies you melt/boil the things to join them together
Conflating the maintenance budget with the money invested in new infrastructure in this way is not very useful IMHO. How much inspection/maintenance money was spent per km of (high-speed and overall) railway track would be much more informative...