It seems a shame that a few other trains passed beforehand with this anomaly in place and yet it went undetected.
It seems a shame that a few other trains passed beforehand with this anomaly in place and yet it went undetected.
For example, in the U.K.:
Germany: https://de.wikipedia.org/wiki/RAILab
Japan: https://en.wikipedia.org/wiki/Doctor_Yellow
France: https://en.wikipedia.org/wiki/SNCF_TGV_Iris_320
China: https://en.wikipedia.org/wiki/China_railways_CIT_trains
> Line inspection is carried out at full speed, up to 270 km/h or 168 mph on the Tōkaidō Shinkansen and 285 km/h or 177 mph on the Sanyō Shinkansen
Under "rail break monitors" it mentions both electrical continuity and time-domain reflectometry can be used, and are most frequently used on high-speed tracks.
In addition, there are vast array of other detectors using acoustic sensors, strain gauges, accelerometers, cameras in the visible and infrared spectrum or laser measurement, that potentially could have detected an anomaly (i.e. damage to the wheels of other trains before the incident).
[0]: https://en.wikipedia.org/w/index.php?title=Defect_detector
We squeezed some track condition monitoring hardware into some locos but it was single-driver operations locations and we cannibalised some of the room that would have otherwise been occupied by the second driver.
It measures vertical forces in kips - (kilo-pounds-force, 1 KIP = 1,000 lbs)
They have these in the USA.
Though conceivably the break was very small and a train impacting the slightly lifted rail just caused a good chunk of it to explode.
The crown (top) of the rail seems to be missing after the gap. The crown-less section then continues ~3 meters before it disappears behind the investigator on the left. IDK what that might indicate.
ref pic: https://ichef.bbci.co.uk/news/1024/cpsprodpb/ecb4/live/53924...
edit: other angles of the same location here: https://youtu.be/DIQ4SrGSua0?t=1174
Ah, I see it now. The marks from contact with the ties should have clued me in earlier.
The crack was in the weld, causing one side to sink and the wheel to hit the start of the next section of rail which was no longer welded to it, causing stress fractures to form in the rail which later caused that 40cm piece to break off.