> "[Prime Minister Donald] Tusk said that a military-grade C4 explosive device had been detonated on 15 November at about 21:00 (20:00 GMT) near the village of Mika."
> "The explosion, which happened as a freight train was passing, caused minor damage to a wagon floor. It was captured on CCTV."
> "Tusk said the train driver had not even noticed the incident."
> "A previous attempt to derail a train by placing a steel clamp on the rail had failed, he added."
> "The second act of sabotage, on 17 November, involved a train carrying 475 passengers having to suddenly brake because of damaged railway infrastructure, said Tusk."
Thus things like these are integrated:
The gap looks about 50cm which is maybe 1.5km of contraction from installation tension.
Some better pictures:
https://www.eisenbahn.gerhard-obermayr.com/produzenten/vae/s...
https://slabtrackaustria.com/our-technology/red/
https://www.voestalpine.com/railway-systems/en/products/rail...
https://upload.wikimedia.org/wikipedia/commons/7/7d/Oelzetal...
https://upload.wikimedia.org/wikipedia/commons/b/bf/Schienen...
https://cmi-promex.com/wp-content/uploads/2023/06/CurvedRail...
https://cmi-promex.com/wp-content/uploads/2023/06/Sound-Tran...
https://www.hsrail.org/wp-content/uploads/2024/06/HSR_Track_...