Come again?
Come again?
We have better/cheaper ways of producing electricity than attaching a heat source to tank of water, boiling the water to produce steam, then forcing the steam through a turbine, capturing the kinetic energy in order to turn the rotor of an alternator. Whether that heat source is coal or nuclear, you're still looking at what is fundamentally a 19th century design - attach a steam engine to an alternator.
Gas turbines remove the boiling water/steam engine part. Wind turbines remove heat from the process completely and solar PV removes the mechanical part.
All 3 technologies are base on mass production - particularly solar PV. And so all have seem massive price decreases which is expected to continue. Meanwhile nuclear gets more and more expensive.
Globally, nuclear peaked about 2 decades in terms of energy production ago, 2.5 decades ago in terms of number of operating turbines, 3 decades ago in terms of share of electricity production and 4 or 5 decades ago in terms of plants under construction.
We are below $1B/GW for solar. China just opened a $100/kWh ($100M/GWh) battery storage plant. All deployable within a year.
Contrast this to $16B/GW for recent nuclear plants, and you don’t benefit from starting a build for another 20 years
It's going great!!!11
https://app.electricitymaps.com/map/zone/DE/live/fifteen_min...
Thanks for cherry picking and not linking averages.
Let’s not stare us blind at perfect in one sector wasting money and opportunity cost which needs to be spent on harder to abate industries.
The energy mix in Germany leads to a situation where electric cars are dirtier than diesel (for the first ~200000 km / 125000 miles driven).
Renewable share of electricity production is about 56% so this claim is not at all credible.
https://www.cleanenergywire.org/news/germany-covers-nearly-5...
Also, Germany currently has the problem of much more and more reliable wind generation in the north, but not enough network capacity to send it all south when needed. It is being addressed, but as expected, it is very complicated because infrastructure across the whole country touches the interests of a lot of groups with very different interests.
We might need much better tunnel building equipment and a deep sub-terranean network... (useful sci-fi idea, needs to be able to cope with mild earth quakes in some regions).
They can go from having over 50% of their electricity generated from renewables, but then suddenly it falls to barely over 20% in a single day. But the low production can last multiple days (for reference, look at the 3rd, 4th, and 5th of December 2025).
For reference, to store a single day of Germany's electricity at the current battery storage price ($66/kwh) you would need over a hundred billion dollars. Even if battery storage is to be divided by 3 in the coming years, we are still talking tens of billions of dollars for something that isn't even reliable and has a hard limit (go over the 3 days of storage capacity, too bad, you're fucked).
Even considering how nuclear construction is stupidly expensive nowadays, that would still be cheaper and more reliable (in large part thanks to German bureaucracy, fuck you by the way for the sabotage at Flamanville).
Renewable is the German superiority complex applied at scale. They can't help themselves from overengineering cars, so that makes sense.
And you are incorrect: renewables are not competitive without heavy subsidies and preferential treatment, such as being allowed to shift the cost of their intermittency onto the reliable producers.
And since nuclear power plants last about 4x longer than renewables, you actually have to install 4x the production to have an equivalent fleet over time.
So by your numbers, the world is shifting towards a nuclear fleet.
The increase in renewable production needs to be 4x greater initially, because of the longer life of nuclear plants. Queueing theory/Little's Law. So this is entirely expected if you are targeting (a) a fairly constant fleet and (b) fairly constant production rate, both of which are desirable.
Under the Messmer plan, France ignored this and built 50+ reactors in 15 years. Which means that they were pretty much done after 15 years, their nuclear industry had basically nothing to do for the next 40 or so years and withered. Bad idea.
The current rate of new construction starts in China implies a build rate of at least 10 reactors per year. With an expected life of 80 years, that implies a target fleet size of around 800 reactors if the rate remains constant.
Consider a city like Mumbai that needs about 3.8 GW per day. One would need lots of windmills and large solar farms that would need to be positioned in a different state having more sunlight throughout the year. Mumbai often experiences cloudy weather and intermittent wind. I cannot imagine only wind and solar supporting the needs of Mumbai.
There are countries other than the US who do not take 20 years to build a reactor. Out-dated regulations, punitive paperwork, and perhaps poor project management are the reasons for the oft-cited delays in the US. Other countries complete their builds in 6 to 7 years. https://thebreakthrough.org/issues/energy/chinas-impressive-...
First, it was a FOAK design. Which always takes longer to build, it is a prototype.
Second, the nuclear build know how in the nuclear engineers, construction workers, and supply chain was not really there any longer.
Third, they used a new permitting system, which in theory should have been better and probably will be better in the future: instead of ongoing individual checks and modifications, which made every nuclear power plant in the US a unique unicorn, you are now allowed to submit a master design and once approved you can build that over and over. Without changes.
Alas, Westinghouse wasn't actually done with the design when they submitted. So when they started building, they noticed that they had submitted plans that could not actually be built. Oops. That cause massive delays. And delays = cost.
And the suppliers fought each other, one went bankrupt etc. COVID also didn't help.
So how can we guarantee that the same won't happen in the future and that NOAK builds will be better? Well, for one they now have plans that are obviously buildable, because a bunch of AP-1000s have been built. So that exact thing absolutely can't happen.
Also, we can look to China. Turns out, China also built 2 FOAK AP-1000s. These also took about 10 years, despite China usually building in 5. And it turns out, China built some more AP-1000s after that. NOAK builds. And these took 5 years to build with buildable plans, experience building that reactors and a mature nuclear industry to back them.
So there is good reason to believe that future NOAK builds of the AP-1000 and of comparable reactors will be much faster and much cheaper than what we've seen so far.
Delays and cost overruns for nuclear are absolutely not atypical. Pick anywhere in the world you want and you’ll find them building reactors easy 50% over time and budget, and many >100%.
One observation is that Small Modular Reactors could take much less time: https://www.sustainabilitybynumbers.com/i/111356564/modular-...
Edited to add: China estimates 10 new reactors at 27 billion in total: https://www.reuters.com/sustainability/boards-policy-regulat...
You can buy a floating nuclear power plant in the form of an aircraft carrier for a lot less than $16B. The US Navy builds these things as a matter of course in a few years using standard designs they crank out by the dozens.
And yes, carriers have a lot less rules because it those have issues we're already in big trouble. You'll need strict rules given the big impact a failure has. No one has an aircraft carrier or sub in their backyard (not constantly that is)
Standardizing a design and building N of them would help though
Surprisingly it seems worthwhile to build solar in places like the UK/Netherlands/Denmark since solar production is negatively correlated with wind.
Norway and Sweden have large hydropower resources too.
And of course the capacity factor for PV is about 10%, so you need 10x the capacity to get the same output even on average. Never mind that you get nothing at night, and very little in winter.
- European electricity review 2024 by Ember
https://ember-energy.org/latest-insights/european-electricit...
In Germany 51 GW is already approved with another 400 GW/661 GWh in interconnection queue.
https://www.ess-news.com/2025/11/12/german-network-operators...
https://energybadboys.substack.com/p/the-baseload-solar-beat...
I will take that as an admission that storage will unlock the curtailed/cannibalized renewables and further reduce the economic outlook for any fuel driven electricity generation like coal, gas and nuclear power.
Contrary to capitalist believe you cannot solve all issues fast by throwing unreasonable amounts of money at it. You must built industries that synergies with each other, have deep institutional knowledge and capable workers that can deliver the tiny tolerances required to make nuclear safe and effective.
We simply do not have the (intellectual) capacity for this anymore and the effort is better spent on battery technology if Europe actually wants to have any stake in future of EV and renewables. It is significantly less capital intense too.