So nuclear reactors can be built to supply the energy and power as the offshore wind farms get decommissioned. The rise and fall.
> Another is the vast cost of nuclear compared to wind.
What do you mean by cost? Capital expenditure per kW of nominal capacity, or by total energy generated? Plus should we consider other costs (backup, transmission, curtailment)?
I suspect we will always keep around a little nuclear to maintain expertise for strategic national security reasons but it is hard to see nuclear power making sense in an energy market dominated by intermittent renewables like the UK.
If that’s too expensive why not just build enough nuclear to cover it all.
Suppose you need 10GW of power for an absolute baseline. Enough to heat homes to a temperature that people don't freeze to death on a cold day, to keep power to hospitals and other critical services, etc. Then you need another 10GW on top of that to run aluminum smelters and heat homes to 80°F instead of 60°F and things like that.
If you have 20GW (average) of wind but you get an extended period of low generation and the batteries run down, people die. If you have 10GW (average) of wind and 10GW of nuclear and you get an extended period of low wind generation, the price of electricity goes up that week and people turn off their aluminum smelters and things but nobody dies. If you have 20GW of nuclear you can run the aluminum smelter 52 weeks a year instead of 51 but then people are paying more for electricity than they would with renewables in the mix, which isn't worth it.
So which one should we do?
But that doesn't change the fact that solar on the margins, without the availability requirement, is quite a bit cheaper than nuclear. So going 100% nuclear probably isn't the cheapest option either. The optimum is a mix in the middle somewhere.
What you’re saying is they they should use extremely expensive nuclear power to cover the easy portion and then have renewables when they are the most strained supply 37 GW.
Why not just cheap renewables for everything?
New built power literally does not make sense when real constraints are added.
The plans just to build a tunnel under the Thames in the UK in 2025 is over 2 million pages at the moment, imagine what it is for the Sizewell C reactor - the environmental assessment on its own was 44,000 pages.
SMRs are a good middle ground because they can be commercialized and cost can be driven down once the government gets out of the way.
The misinformation hasn’t occurred in a vacuum. The nuclear industry has been far from transparent in how it operates.
The lack of commercialization has exactly a single reason: The lack of commercial viability.