Company went bust before it got fixed.
Just use UTC folks unless you have a really good idea why you shouldn't.
Company went bust before it got fixed.
Just use UTC folks unless you have a really good idea why you shouldn't.
Right now it reads "EDT, UTC-4, until: Sun, Nov 2"
Going to add a clock next to it now, that's a great idea
$ zdump -Vc 2025,2026 America/New_York
America/New_York Sun Mar 9 06:59:59 2025 UT = Sun Mar 9 01:59:59 2025 EST isdst=0 gmtoff=-18000
America/New_York Sun Mar 9 07:00:00 2025 UT = Sun Mar 9 03:00:00 2025 EDT isdst=1 gmtoff=-14400
America/New_York Sun Nov 2 05:59:59 2025 UT = Sun Nov 2 01:59:59 2025 EDT isdst=1 gmtoff=-14400
America/New_York Sun Nov 2 06:00:00 2025 UT = Sun Nov 2 01:00:00 2025 EST isdst=0 gmtoff=-18000
$ zdump -Vc 2025,2026 Europe/London
Europe/London Sun Mar 30 00:59:59 2025 UT = Sun Mar 30 00:59:59 2025 GMT isdst=0 gmtoff=0
Europe/London Sun Mar 30 01:00:00 2025 UT = Sun Mar 30 02:00:00 2025 BST isdst=1 gmtoff=3600
Europe/London Sun Oct 26 00:59:59 2025 UT = Sun Oct 26 01:59:59 2025 BST isdst=1 gmtoff=3600
Europe/London Sun Oct 26 01:00:00 2025 UT = Sun Oct 26 01:00:00 2025 GMT isdst=0 gmtoff=0TZ="Etc/UTC" xclock -analog -update 1 -norender -hl grey -fg grey -bg black
(or similar) would also suffice.
I get a daily status report of various things from our 24 hour operational management team which runs at 8am UK time every day. That means last week it ran at 0700UTC and this week at 0800UTC
This is built around operational events, shift changes, etc.
I've got another system which is in operation in Sydney from 0630 to 1630 local time, this means that maintence windows which overlap with UK shift patterns depend on the week but mean the system is operating 2130-0730 UK time at some times, 2030-0630 UK at others, and 1930-0530 at others.
UTC is not "the answer". Sometimes you want things running at a UTC time, sometimes you want them running at local time.
I have a regular meeting at 10am London time on Tuesday and Thursday. That can't be stored in UTC as it varies depending on the time of the year. It has to have the timezone stored and actioned.
But if the job is set to run in UK time and the system clock jumps around because of TZ changes, it will run twice or not at all.
Having a stable zero based time that doesn't move around by external forces that you can't control is "the answer."
How about I use some form of library to do it. I tell it I want to run at 0800 London time, and it runs at 0800 London time
If I tell it I want to run at 0130 London time (or 0330 Athens time) I still have a problem -- do I run it twice when the clocks go back, do I skip it when clocks go forward?
But that's a business logic problem, and defining it as UTC and having another job to update the time twice a year doesn't actually solve the question of "what do I do at this point".
This isn't a problem that can be solved with a single technical solution.
> If I want a report of what happened at a specific time I need that report at local time
this is hard when a particular hour can happen twice in a day right?
If the business requires it to run at 01:30 and there are two per day, or zero per day, then the business rules needs to define what happens. You can't solve this by running it at UTC.
People generally expect things like usage limits to reset overnight, not at UTC midnight, and these are often implicitly tied to (the result of) batch jobs.
Financial jobs, including billing, is another big category.
The reporting job should be run from a server on UTC and on UTC time. The report itself can convert to whatever is local time.
All of yours might well be, but you can't generalize that assumption to every domain and scenario.
How are you going to do this? Clearly cron (with timezone set to UTC) doesn't work for this so you'll need another system. In that case why not have that multi-time zone scheduling system run your script?
But also, if the user can change the timezone themselves, now you have a condition where the user could keep their quota at bay for a very long time (if not forever) if they keep changing their timezone accordingly.
How hard is to convert the UTC time to user's local time and perform quota reset?
I mean you should be doing this anyway. Even if you store everything in PST or EST or CST, you never know when you'll get customers from another part of the world and then you'll have to do this anyway. So why not do this already?
Probably roughly as hard as writing a timezone-aware scheduler that considers all edge cases around daylight savings time, i.e. probably possible but I'd try fairly hard to see if I can get around it.
One way of getting around it is to run your batch jobs in your "primary business timezone". Sure, you might outgrow that concept eventually, but many companies never do, and in that sense "running on UTC" seems similarly aspirational in spirit (albeit at a much smaller scale) to starting with high scalability.
1. allowing users to change their timezone and tying it to when their quota reset sounds like a great way to add more edge cases and complexity. For instance, does messing with your time zone mean you can get your quota reset multiple times a day?
2. Not everyone operates some sort of global b2c SaaS that's timezone agnostic. For many enterprise backoffice tasks "6am HQ time" is far more reasonable than "6am/7am, dunno depends on whether daylight saving time is on or not". In this case having a server set to the HQ's timezone makes far more sense than doing UTC and trying to work around daylight saving issues.
Instead of tying your quotas to calendar days in some specific time zone, tie them to a rolling 24 hour usage period. Even better: use a rolling hour.
Better to localize times for users on the client-side based on their local settings, IMHO
For quotas and usage limit resets it can be a little harder, but if it's a cron job anyway, my initial approach would be to just schedule it for a time that is close to midnight for the area your customers are in.
That sounds a bit like reimplementing a scheduler inside the scheduled task (which is ok if you don't trust your scheduler, but I'd avoid it if at all possible).
- Check if run today, exiting on "yes"
- Run
- Update the last-run-on date
But as soon as one job needs another to complete first, or two jobs shouldn't be run at the same time - things start getting messy.
I can think of several ways to mess that seemingly trivial calculation up just from the top of my head. (Consider changing timezones, increasing the interval the job is running to within half a day of scheduling period etc.)
This doesn’t work as soon as you become a global business… because if you tell a customer in Asia that it resets at midnight in some US timezone, what are they going to think?
Many people will accept UTC because it is the international standard. Everyone will accept “let each customer pick the timezone that works best for them”. Saying “I’m going to use a US timezone because that is easiest for our US customers” risks sending a message to your (now or future) global customers that you view them as second-class citizens.
> Many people will accept UTC because it is the international standard.
I really wish that were true universally...
And I do think that UTC is actually somewhat Eurocentric! From personal experience, it's significantly easier to mentally add/subtract one or two hours (modulo 24) than 7 or more.
> Saying “I’m going to use a US timezone because that is easiest for our US customers” risks sending a message to your (now or future) global customers that you view them as second-class citizens.
Definitely, but on the other hand, I do think that picking your head office's time zone as the "canonical" one for resetting quotas etc. has some merit as well, if only because it makes the concepts of "today" and "tomorrow" work a bit better. (UTC midnight might be very unintuitive to both you and your customers.)
What happens when you move your head office to a different time zone? e.g. Oracle moved their HQ from California to Texas (and have announced a further move to Tennessee, although last I heard that still hasn’t happened)
What happens when an M&A happens and you are now part of a much larger enterprise with a different HQ timezone, and systems with wildly inconsistent configured timezones due to having acquired multiple companies which had HQs in different time zones and all of which configured everything to use their HQ time?
> UTC midnight might be very unintuitive to both you and your customers
I live in eastern Australia, UTC+11 at the moment (UTC+10 during Southern Hemisphere winter). Right now, resetting stuff at UTC midnight means at 11am my time, resetting stuff at US Eastern midnight means at 3pm my time - roughly equal in potential inconvenience, but I’ll be much more forgiving of the first than the second.
> And I do think that UTC is actually somewhat Eurocentric! From personal experience, it's significantly easier to mentally add/subtract one or two hours (modulo 24) than 7 or more.
For me, add/subtract 10 is pretty easy… and then just one more during DST. Does that make UTC “Australia-centric”? Or Guam-centric or Vladivostok-centric? (both of which are also UTC+10)
Just found out some guy decided to try to restart the company. Good luck. https://x.com/Austen/status/1981904435539280324
If my whole team is based in Pacific Time, I'm gonna use something close to PT so I don't have to do hard math when reading raw logs.
If we're all US based, I still want something in the USA. The math is easier.
If it's local time I know instantly when something happened, without having to do mental math.
Is there anything wrong with ISO8601 (including timezone offset) for storing times? They're in my local time, but they can be accurately converted to any other timezone.
It's just easier for everyone if we agree on UTC and everyone knows their own offset.
I'd expect everyone who works in computer related jobs to know their UTC offset.