I’m finishing up a DIY ground install and just the conductor from the array to the service panel cost the same as about 3 panels. It’s about a 150 meter run.
Some very rough numbers from memory:
- 20 panel + 10 microinverter bundle: $5600
- cost to ship the bundle: $700
- conductor: $450
- steel/pvc conduit for conductor sheath: $350
- strut for racking: $500
- 3” steel conduit for ground mount: $5000
- concrete and tube forms for vertical post footers: $400
- augur/trencher rental: $500
- brackets/fasteners: $600
- tools: $500
- electrician work to upgrade service panel: $2500
- electrician work for hookup and disconnect install: still TBD but I’m guessing more thousands
- time spent x my current hourly salary as a programmer: I don’t want to think about it haha
Probably a bunch of stupid little stuff I’m forgetting. Just gas to go on supply runs is probably over $100, although I always tried to batch runs with other normal errands.
The most expensive parts of projects can be surprising, at least to me. I also recently invested in my own fuel transfer pump to transport home heating fuel instead of paying for delivery. 55 gallon drums: $20 each. Pump: $200. But the most expensive part was actually the 15 meters of arctic grade fuel hose at over $400.