If it’s anything like the SLS it’ll cost 100 times as much and take 3 times longer than if was outsourced to the private sector.
Another point is that NASA also works as a job program for a lot of states.
If this second provider was a NASA project everyone would be screaming how much of a waste it is. Conclusion? Space remains hard.