No, it isn't. Any decent datacenter will have on-site generation in event of power grid failure, anyway. When I was an intern, the company I worked for would routinely go off grid during the summer at a call from the electric company. The electric company actually gave us significant incentives to do so, because us running on our own 12MW generator was effectively like the grid operator farming out a 12MW peaker unit.