At $50/kwh of batteries + $50/kwh of battery install labor...
And at $150/kw of panels, $100/kw of inverters & copper, $100/kw of mounting, $100/kw of install labor, and $100/kw of real estate...
And at a 1W : 1kwh/yr (11%) duty cycle (my area should be 50% over that, but let's use conservative assumptions for low-maintenance vertical mounts)
And a level of conservativeness around power supply that reserves 60 hours of battery bank...
...
I can run a steady 1kw load (a GPU, let's say) for ~9kw of panels ($4950) + 60kwh of batteries ($6000), or $10,000. Capital cost of $10/watt.
Vogtle 3 and Vogtle 4 are going to end up averaging about 2.1GW for an estimated construction cost of perhaps $34 billion by the time everything is complete, or a capital cost of about $16/watt.
There is reason to expect the nuclear construction industry to drop in costs as it ramps up in size, but solar is already cost competitive here and it does not require the government to take over various costs like insurance, nor require the same political capital, approval process, or long financing period before initial payoff.