Rotterdam turned 15,000 EV chargers into a virtual power plant
lastmilesolutions.com
lastmilesolutions.com
A better term would be "managed brownouts" or "rolling brownouts to chargers". They are just reducing services to EV chargers when demand is exceedingly supply to try to avoid impacting other things.
> Early Beginnings: 1970s to 1990s Demand Response emerged during the energy crises of the 1970s. During this period, the U.S. faced significant energy shortages, prompting utilities and policymakers to explore innovative ways to manage electricity demand and avoid blackouts. Initial DR efforts were rudimentary, focusing on direct load control. Utilities could remotely switch off high-energy appliances like air conditioners during peak demand periods. These early programs were primarily designed to prevent grid failures and reduce the need for constructing new power plants .
> In the 1980s, DR programs began incorporating time-of-use pricing, which incentivized customers to shift their electricity usage to off-peak hours by offering lower rates during these periods. This strategy aimed to flatten demand curves and reduce the strain on the grid during peak hours .
https://www.energytoolbase.com/blog/energy-storage/the-evolu...
https://www.energycodes.gov/sites/default/files/2025-01/Tech...
Turning off AC units in regions to shed load was a very crude tool with tech available at the time, broad internet connectivity and sophisticated power controls and energy storage allows for much more sophisticated grid energy orchestration (enabling "virtual power plants"). The term of art is a result of the state of the art grid power control advancements.
https://www.technologyreview.com/2024/02/07/1087836/how-virt...
https://greenmountainpower.com/news/gmps-request-to-expand-c...
https://en.wikipedia.org/wiki/Virtual_power_plant
https://hn.algolia.com/?dateRange=all&page=0&prefix=true&que...
You know shit is messed up when even engineers can't use words that mean anything anymore.