Plant startup is only the first step.[1] It's load pickup.
Here is a PJM training module on load pickup during system restoration.[2] It gives a sense of how touchy the process is. Power network control has good control over generation and transmission, but limited control over load.
When load is turned on, there are transient loads with different time constants. There's a huge load for the first second as inductors, capacitors, and incandescent filaments start up. That tails off in under a second. There's a second load as motors wind up to speed. Ten seconds or so. Then there's "cold load", where everything in HVAC starts trying to get temperatures back to normal. Maybe half an hour.
There's no mention of computer control. Listening to this, you visualize people running around reading meters and throwing big switches. It's probably people looking at display boards and sending commands to remote big switches, but the concept is the same.
Botching this means voltage or frequency goes out of tolerance, protective devices shut things down, and the system operators have to start over.
More PJM training modules on related subjects.[3]
Unclear what caused this yet. Something caused enough system instability to trip protective devices, but there's no good info yet. Once everybody has a chance to compare all the logging data from different points, it will make more sense.
[1] https://pjm.adobeconnect.com/_a16103949/p622tuwooba/